Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 35 of 151 <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil from Stockpile to Refuse Pile <br />Site: Williams Fork Mines Permit Action: MT7 Permit/Job#: C1981044 <br />PROJECT IDENTIFICATIOlS <br />Task #: 019 <br />Date: 2/16/2016 <br />11:28:50 AM <br />State: Colorado <br />County: Moffat <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 637G <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C1981044-019 <br />COSTShift basis: 1 per day <br />Cost Breakdown: Scraner Work Team Sunnort Fouinment Maintenance Fouinment <br />Total work team cost/hour: $792.44 <br />MATERIAL OUANTITIES <br />Initial volume: 32,670 CCY Swell factor: 1.125 <br />Loose volume: 36,754 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$132.77 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$229.20 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$34.24 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$396.22 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$792.44 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $792.44 <br />MATERIAL OUANTITIES <br />Initial volume: 32,670 CCY Swell factor: 1.125 <br />Loose volume: 36,754 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />CIRCES Cost Estimating Software <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />2,550 lbs/LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />Earth - Dry packed <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />32.00 LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />