Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 29 of 151 <br />BULLDOZER WORK <br />Task description: Remove Fill from No. 5 Mine Dew-, <br />Site: Williams Fork Mines Permit Action: MT7 <br />PROJECT IDENTIFICATIOI\ <br />Task #: 015 <br />Date: 2/16/2016 <br />11:25:29 AM <br />State: Colorado <br />County: Moffat <br />User: JLE <br />Agency or organization name <br />DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D10T - 10SU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />1 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />NA <br />Borehole Access Road <br />Pere- tWob#: C1981044 <br />Abbreviation: None <br />Filename: C1981044-015 <br />Total unit Cost/Hour: $357.27 <br />Total Fleet Cost/Hour: $1,429.07 <br />MATERIAL OUANTITIES <br />Initial Volume: 100 <br />Swell factor: 1.060 <br />Loose volume: 106 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Division Estimate <br />Cat Handbook <br />100 feet <br />1,718.9 LCY/hr <br />Compacted fill or embankment 0.9 <br />Average push 0% <br />gradient: <br />Average site altitude: 5,400 feet <br />Material weight: 3,250 lbs/LCY <br />Weight description: Gravel - Pitrun <br />Job Condition Correction Factor <br />Source <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$145.36 <br />NA <br />Operating Cost/Hour: <br />$173.02 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.89 <br />NA <br />Total unit Cost/Hour: $357.27 <br />Total Fleet Cost/Hour: $1,429.07 <br />MATERIAL OUANTITIES <br />Initial Volume: 100 <br />Swell factor: 1.060 <br />Loose volume: 106 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Division Estimate <br />Cat Handbook <br />100 feet <br />1,718.9 LCY/hr <br />Compacted fill or embankment 0.9 <br />Average push 0% <br />gradient: <br />Average site altitude: 5,400 feet <br />Material weight: 3,250 lbs/LCY <br />Weight description: Gravel - Pitrun <br />Job Condition Correction Factor <br />Source <br />CIRCES Cost Estimating Software <br />