Laserfiche WebLink
Demo Worksheet Cont'd <br />Task # TTT <br />Operator Skill: <br />0.750 <br />(AVG.) <br />Material consistency: <br />0.900 <br />(CAT HB)) <br />Dozing method: <br />1.000 <br />(GEN.) <br />Visibility: <br />1.000 <br />AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />0.800 <br />(FND-RF) <br />Push gradient: <br />0.903 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.868 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.3513 <br />Adjusted unit 238.88 LCY/hr <br />production: <br />Adjusted fleet 955.52 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $1.504/LCY <br />Total job time: 60.93 Hours <br />Total job cost: $87,540 <br />Page 18 of 151 <br />CIRCES Cost Estimating Software <br />