Laserfiche WebLink
------------ <br />Project Name <br />Oxford, Darnell <br />Coal Basin Erosion <br />Control S Maintenance Project <br />CO #1 Total PO <br />$ - $ 17,300.00 <br />--------------- - - - - 0005_-AD00049260318 <br />12/3/2010 <br />ICO # 1 Total Item Cost Inv # 1099 <br />$ 4,000.00 $ 2,000.00 <br />$ 250.00 $ 250.00 <br />-- - <br />$ 3,000.00 <br />$ _ 2,000.00 $ 2,000.00 <br />$ 2,000.00 $ 2,000.00 <br />$ 1,600.00 $ 1,600.00 <br />$ 1,250.00 <br />$ 1,800.00$ <br />-- - <br />_ <br />Project Manager: Steve Renner <br />No retainage deducted <br />Orow PO <br />$ 17,300.00 <br />OE-PKA-11000000034 <br />- <br />Fnd: 270, Appr: 133 <br />I <br />Mob /demob <br />- <br />Sheap Maint tasks <br />channel maintenance <br />erosion control at roads <br />erosion control previosly reclaimed � <br />channel construction <br />debris removal <br />Revegetation <br />Add'l machine time <br />track excavator <br />bulldozer w/ope atorerator <br />Amt Remaining <br />$ 2,000.00 <br />$ - <br />- - <br />$ 3,000.00 <br />- --- <br />Item <br />Original PO <br />Inv # <br />;Total Invoiced <br />1 <br />$ 4,000.00 <br />$ 250.00 <br />$ 2,000.00 <br />$ 250.00 <br />--- - <br />$ - <br />$ 2,000.00 <br />$ 2,000.00 <br />$ 1,600.00 <br />- -- ---- <br />$ - <br />- <br />-- <br />$ - <br />2 <br />-- - 3 - <br />a <br />_ b <br />c <br />d <br />e <br />4 <br />5 <br />a <br />b <br />$ 3,000.00 <br />$ 2,000.0_0 <br />$ 2,000.00 <br />_ <br />t <br />$ - <br />$ - <br />$ - <br />$ 1,600.00 <br />$ 1,250.00 <br />$ 1,80.0.00 <br />- - - <br />$ 600.00 <br />17,300.00 <br />-- -- <br />$ 1,250.00 <br />$ 1,800.00 <br />$ 800.00_ <br />- -- -- <br />r _ <br />$ _8.0.0_ .00 <br />$ 600.00 <br />- -- <br />$ 7,850.00 <br />$ - <br />$ 600.00 <br />$ - <br />$ 17,300.00 <br />$- <br />$ 7,850.00 <br />$ 9,450.00 <br />Coal Basin Erosion Cont Maint Cost_FeatCloseSummary.xlsx <br />