Laserfiche WebLink
06/17/2008 09:14 9708722422 RED DOG ENTERPRISES <br />i <br />COAL BASIN DITCH 8 RECONSTRUCTION PROJECT <br />PKA-8-1137 <br />REWSED BID SCHEDULE, June 9. Q8 <br />IReturn by June 17, 2008 at 3:30 P.M. to: Receipt of Addenda <br />Nos. <br />is hereby acknowledged <br />Yvonne Brannon <br />Division of Reclamation, Mining and Safety <br />1313 Sherman St., #215 <br />Denver, CO 80203 <br />Fax (303) 832-8106 <br />rHut eel <br />ITEM <br />DESCRIPTION <br />QTY <br />UNIT <br />Unit Price <br />AMOUNT <br />1. <br />Mobilization I <br />1 <br />Job <br />N/A <br />$ ASO <br />Demobilization <br />2. <br />Excavation <br />745 <br />LF <br />$ � <br />$ 3926 - <br />926Provide, <br />Provide, Place <br />3. <br />Rip Ra <br />a. <br />Nominal 1' <br />540 <br />Rocks <br />$ <br />$��a r <br />Diameter <br />b. <br />Nominal 2' <br />Diameter <br />224 <br />L Rocks <br />$ <br />$ <br />C. <br />Nominal 4'. <br />Diameter <br />84 <br />Rocks <br />$ O �" <br />$ <br />Equipment <br />4. <br />Rental <br />Komatsu PG <br />o e <br />/ O y© <br />4a. <br />150 (with <br />8 <br />Hours <br />s130%'$ <br />thumb), or <br />equivalent <br />S. <br />Revegetabon <br />1 <br />Ac. <br />$ 2 <br />0 <br />GRAND TOTAL $ �� <br />THIS BID SCHEDULE MUST BE RETURNED <br />Page 1 of 2 Pages <br />