Laserfiche WebLink
LIQUIDATED DAMAGES <br />The liquidated damages for this project will be $400.00 per day. Please see General Bid <br />Specifications 2006, Article 39. <br />PROJECT FUNDING <br />This project is funded 100% through monies made available to the State of Colorado through <br />revocation of bond monies retained by the Division of Reclamation, Mining and Safety for <br />reclamation of this previously permitted mining operation. <br />GENERAL BID SPECIFICATIONS <br />The Colorado Inactive Mine Reclamation Program General Bid Specifications 2006, which <br />include General Conditions, Standard Work Specifications, and Standard Drawings and Figures <br />are intended to complement this Documented Quote. The Documented Quote combined with <br />the General Bid Specifications 2006 form the complete Invitation and Bid document. Please <br />refer to the Standard Work Specifications for all applicable types of work required in the <br />Documented Quote. Copies of the General Bid Specifications are available at the Pre -Bid <br />Meeting or from the Division of Reclamation, Mining and Safety (CDRMS), 1313 Sherman <br />Street, Room 215, Denver, Colorado 80203 (303) 866-3567. <br />Work Description <br />The attached General Conditions for Purchase Orders and Purchase Order Terms and <br />Conditions apply to all work. <br />The goal of this project is to reconstruct Ditch 8 at the Sutey Refuse Disposal Facility at the now <br />inactive Coal Basin Mine. <br />Ditch 8 is a steep man-made channel which drains a portion of the reclaimed Sutey Refuse <br />Disposal Facility. Due to the steep nature of this channel, it is experiencing severe erosion. <br />The channel will be stabilized as a result of this project by excavating a wider channel to <br />bedrock, and placing large diameter durable rock rip rap into the widened channel. Excavated <br />dirt will be placed adjacent to the channel, and will be revegetated. <br />Task 1. Mobilization / Demobilization <br />This task includes those measures necessary and incidental to move equipment and supplies <br />onto the Project Area, to move equipment within the Project Area during the project, and to <br />complete any other requirements necessary to perform this project. This item also includes all <br />labor, equipment, and costs associated with demobilization and clean-up of the work site <br />following completion of the project. <br />Please see Specification 1.0, Mobilization / Demobilization of the General Bid Specifications, <br />Colorado Inactive Mine Reclamation Program, 2006. <br />A copy of the General Bid Specifications, 2006, may be obtained from: <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street Room 215 <br />Denver, Colorado 80203 <br />303-866-3567 <br />CI <br />