Laserfiche WebLink
Ite <br />m <br />Project Name <br />-Oxford, Darnell - - <br />Project Manager: Steve Renner <br />No retainage deducted <br />OE-PKA-09000000007 - - <br />' Fnd: 270, Appr: 133 - <br />1 Mob/demob -- <br />2 Excavation <br />3 Provide/Place rip rap - <br />a Nominal 1' diameter <br />b Nominal 2' diameter <br />c Nominal 4' diameter <br />4 Equipment Rental - <br />4a Komatsu PC 150 <br />5 _Revegetation - <br />Total <br />Coal Basin Ditch 8 Reconstruction Project <br />PO CO #1 <br />$ <br />21,677.00 $ 9,750.00 $ <br />r <br />_9/12/20.08 <br />Original PO CO # 1- <br />Tota <br />$ <br />-3,500.00 - <br />$ <br />$ <br />3,725.00 - <br />$ <br />$ <br />4,860.00 <br />- <br />$ <br />} <br />$ <br />4,032.00 <br />4,860.00 <br />$ <br />$ <br />2,520.00 $ <br />$ <br />1,04_0.00 $8_,580.0$ <br />$ <br />2,000.00 $ <br />$ <br />21,677.00 <br />$8,580.00 <br />$ <br />$ <br />- <br />Coal Basin Ditch 8 Recon Cost_FeatCloseSummary.xls <br />Total PO <br />31,427.00 <br />0005-AD00047743501 <br />0005-AD00047743501 <br />_9/12/20.08 <br />9/12/2.00.8 <br />�Tota—lllnvoiue-dAmt <br />I Item Cost <br />Inv # 0820 <br />LInv # 0821 <br />Remaining <br />3,500.00 <br />3,725.00 <br />$ <br />$ <br />3,500.00 <br />3,725.00 <br />$ <br />$ <br />3,500.0_$ - <br />3,725.00 $ - <br />4,860.00 <br />$ <br />4,860.00 <br />4,860.00 $ - <br />4,032.00 <br />$ <br />4,032.00 <br />4 <br />$ <br />4,032.00 $ - - - <br />2,520.00 <br />$ <br />2,520.00 <br />$ <br />2,520.00$ - <br />9,620.00 $ <br />780.00 <br />$ <br />8,580.0.0 $ <br />9,360.00 _$ 260.0_0 <br />2,000.00$ <br />2,000.00 <br />$ <br />2,000.00 $ - <br />30,257.00 <br />$ <br />21,417.00 <br />$ <br />8,580_.00 <br />$ <br />29,997.00 $ 260.00 <br />-F <br />Amt will be liquidated <br />upon final payment <br />