EMERGENCY CHANGE ORDER <br />COLORADO DIVISION OF <br />RECLAMATION, MINING <br />& SAFETY <br />1313 Sherman St. Rm. 215 <br />Denver, CO 80203 2273 <br />303 866-3567 <br />Project Name <br />Date <br />Coal Basin Ditch 8 Reconstruction Project <br />July 31, 2008: <br />Contractor Name: <br />Bid # PKA-8-1137 <br />Red Dog Enterprises <br />Contractor Address: <br />Agreement # <br />P.O. Box 452 <br />Hotchkiss, Colorado 81419 <br />Project Manager: <br />Change Order # 1 <br />Steve Renner <br />Use this form to <br />authorize work changed due to changed conditions within the scope of the Agreement. Emergency Change <br />Orders resulting in increased <br />Agreement price <br />or Completion time must be approved by a formal Change Order WITHIN 14 days. The following changes are <br />authorized at the direct of the <br />PROJECT MANAGER. <br />Item No. <br />DESCRIPTION OF CHANGES <br />$ Increase/Decrease <br />The Coal Basin Mine is a revoked permit site. Reclamation maintenance is <br />1 <br />being completed using forfeited reclamation bond money. <br />+$9,750.00 <br />An evaluation of the site has revealed that additional maintenance work is <br />s <br />required at other portions of the mine site due to erosion resulting from spring <br />runoff. <br />w <br />Road F near the former Mine 3 loadout facility will require gully repair work. <br />This work will consist of excavating the existing gullies that cross the <br />reclaimed roadway so that the side slopes do not exceed a 3H : 1V <br />configuration, and so that the centerline elevation of the gully blends with <br />adjacent topography at the inlet and outlet. Excavated dirt will be placed on <br />the down-slope side of each excavation. <br />A former culvert crossing of a tributary to Coal Creek on Road G near the <br />Coal Basin town site will require significant excavation and grading in order <br />i <br />that the side slopes of the stream crossing are stable. Side slopes above the <br />creek elevation will be excavated to a 1.5H : 1V configuration. Excavated dirt <br />will be placed adjacent to the stream crossing on either side of the <br />excavation. Any culvert remnants located adjacent to the excavation will be <br />retrieved, crushed flat and buried in a location to adjacent to Road G in the <br />immediate vicinity of the stream crossing. <br />Because the access to the areas to be maintained have been previously <br />reclaimed, the track excavator must access each work area from the Lamp <br />house under its own power. <br />It is estimated that up to 75 hours of machine time will be required at an <br />hourly rate of $130.00 per hour, with operator. <br />Net Change in Agreement <br />Price: +$9,750.00 Net Change <br />in Agreement Time: + 10 days <br />This document shall become an a ment to the Agreement. All Agree ent rovisions shall apply. <br />Approved by: _-- , Project Manager <br />Date: <br />Accepted by: , Contractor <br />Date:^ Q <br />Revised 7/02 1 <br />