Laserfiche WebLink
CHANGE ORDER <br />COLORADO DIVISION OF <br />Whereas, authority exists in the Law and Funds have been budgeted, appropriated and otherwise made available and a <br />RECLAMATION, MINING <br />sufficient uncommitted balance thereof remains available for encumbering and subsequent payment of this contract under: <br />AND SAFETY <br />Encumbrance Number in Fund Number Appr GBL <br />1313 Sherman St. Rm. 215 <br />Denver, CO 80203 2273 <br />303 866-3567 <br />Project Name <br />Date <br />Coal Basin Ditch 8 Reconstruction Project <br />July 31, 2008 <br />Contractor Name <br />Bid # <br />Red Dog Enterprises <br />PKA-8-1137 <br />Contractor Address <br />Agreement # <br />P.O. Box 452 <br />Hotchkiss, Colorado 81419 <br />Change Order # 1 <br />Project Manager <br />Steve Renner <br />The following chan es are hereby made to the Agreement include the cost/time adjustment for each than e <br />Repair gullies at previously reclaimed portions of Roads F and G as described in the attached Emergency Change <br />Order. Machine time will be used to stabilize gullies which have developed on Road F and to stabilize an erosive <br />stream channel on Road G. Because each gully and the stream channel crossing will require unique excavation and <br />grading solutions, machine time is deemed to be the most appropriate method of payment to accomplish the scope <br />of work. <br />Justification <br />It is necessary to complete this additional work at this time for the following reasons: <br />- A contractor will be on-site with an appropriately sized piece of equipment completing the previously specified <br />repair work at Ditch 8; <br />- Anequipment rental price has been established in the Ditch 8 Reconstruction Project Bid; <br />- A forfeited reclamation bond is being used to fund this work. These funds are limited. Use of the Ditch 8 <br />Reconstruction contractor will save additional mobilization expenses; <br />- The work should be done expeditiously as summer thunder storms will exacerbate the erosional problems <br />occurring at the identified work locations. <br />CHANGE TO AGREEMENT PRICE: <br />Original Agreement Price:: <br />$21,677.00 <br />Current Agreement Price adjusted by previous Change Orders : <br />$21,677.00 <br />The Agreement Price due to this Change Order will be increased by: <br />$9,750.00 <br />The new Agreement Price including this Change Order will be: <br />$31,427.00 <br />CHANGE TO AGREEMENT TIME: <br />This Agreement time will be increased by: <br />10 davs <br />The date for completion of all work will be: AuuSt 21, 2008 <br />Recommended b <br />-�-- Date: ' �S- - 3 y <br />`1 <br />Date: <br />Date: <br />DMG Project Manager le Re resentative <br />Accepted by: <br />Date: -Z,- c� 0� Date: <br />for State Buildings and <br />Contractor Real Estate Programs <br />Approved <br />--' Date: 05L G,0J - CA <br />Date: <br />DMG Protect Su ervisor ,for the State Controller <br />Revised 12/06 <br />