My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-08_REVISION - M1986079 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986079
>
2010-10-08_REVISION - M1986079 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:42:01 PM
Creation date
2/17/2016 12:22:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986079
IBM Index Class Name
REVISION
Doc Date
10/8/2010
Doc Name
Approval of Surety Reduction Request SR03
From
Lafarge North America
To
DRMS
Type & Sequence
SR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Task # : EXC State :Colorado <br />Date : 10/07/2010 County :Adams <br />User : 1382 Site :M&G Poly Mann <br />Agency or organization name :DRMS <br />Permit/job # :M-1986-079 <br />Abbreviation : none <br />Filename :M079-EXC <br />Permit or other job action :Surety Reduction Request SR -3 <br />Task description :Shape lakeshore to 3:1 using Ecavator <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />Machine description : Cat 320C <br />Utilization % <br />Ownership cost/hour : $26.97 NA <br />Operating cost/hour : $36.07 100 <br />Operator cost/hour : $38.72 NA <br />Total unit cost/hour : $101.76 <br />MATERIAL QUANTITIES <br />Initial <br />volume : 2,778 <br />BCY <br />Swell <br />factor : <br />Source of estimated volume : estimated <br />1.250 <br />Loose <br />volume : <br />Horsepower : 138 <br />Weight (MT) : 19.70 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : $101.76 <br />3,472 LCY <br />Source of estimated swell factor :internal <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty) <br />Basic job condition description : <br />Secondary job condition within basic description : <br />Cycle time value : <br />Bucket Capacity <br />Rated bucket capacity : 1.63 LCY (heaped) Bucket size class : <br />Bucket fill factor : 0.97 Sand and gravel (95% - 100%) <br />SEVERE <br />AVERAGE <br />0.36 <br />medium <br />Adjusted bucket capacity : 1.59 LCY <br />Job Condition Correction Factors <br />Site altitude : 5,000 feet <br />Altitude adjustment : <br />Job efficiency adjustment : <br />Net job correction : <br />Unadjusted hourly unit production : 263.41 LCY/hour <br />Adjusted hourly unit production : 218.63 LCY/hour <br />Adjusted hourly fleet production : 218.63 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) <br />Unit cost : $0.465 per LCY <br />Total job time : <br />Total job cost : <br />1.00 <br />0.83 <br />minutes <br />0.83 <br />15.88 <br />$1,616 <br />Source <br />(Cat HB) <br />(1 shift/day) <br />multiplier <br />hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.