My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-11_REVISION - M1987049 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987049
>
2009-05-11_REVISION - M1987049 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:06:00 PM
Creation date
2/17/2016 12:21:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987049
IBM Index Class Name
REVISION
Doc Date
5/11/2009
Doc Name
Amendment Application Submittal AM02
From
Mccanne Ditch And Reservoir Company
To
DRMS
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SENTIBY=C1&P <br />; 4-14-97 ; 3:37PM . <br />3038619026-, 9703661111;# 7/ 8 <br />6. Maintenance of water elevation in the three lakes is essential to <br />maintaining the flow of water in the McCanne Ditch. Ready Mixed agrees that <br />it will set the overflow pipes between the three lakes, -as depicted on Exhibit A, <br />at such elevations as to maintain a water elevation of 4,9E5.0 feet in the north <br />lake, labeled II, IiI and iV on Exhibit A, a water elevation of 4,970.0 feet in <br />the middle lake, labeled V and VI on Exhibit A, and a water elevation of 4,973.0 <br />feat in the south lake, labeled VII and VIII on Exhibit A. Furthermore, Ready <br />Mixed will cover the dikes with overburden material along the west side of each • <br />of the lakes and the northwest side of the north lake to reduce seepage to the <br />river and along the east side of the north lake to minimize the hydraulic connection - <br />between the ditch and the lake. Ready Mixed will construct a controlled overflow <br />from the northeast corner of the north pond into the McCanne Ditch of at least <br />ten inches in diameter to allow the controlled overflow of water Into the McCanne <br />Ditch. <br />7. To prevent damage to the McCanne Ditch as a result of flooding, a <br />depression in the dike should be placed in the north lake on the north or northwest <br />' portion of the dike as an emergency spillway so flooding water will go to the <br />river. Ready Mixed may, as required by the Urban Drainage and Flood Control <br />District, incorporate this depression into the Urban Drainage and Flood Control <br />District requirements. <br />8. Any proposed changes in the mining plan must be approved by McCanne. <br />9. McCanne agrees it will not raise any objections, legal or otherwise, <br />to Ready Mixed's application to the Mined Land Reclamation Board for a mining <br />permit nor object in any way to Ready Mixed obtaining the required zoning and <br />state permits to allow it to operate the mine on the subject property. <br />10. This Agreement shall be a covenant running with the land, shall be <br />binding upon the parties, their heirs, personal representatives, administrators, <br />successors and assigns and shall be enforceable against the same. <br />11. This document represents the complete agreement of the parties hereto <br />and no oral modification shall be recognized. Any amendments or additions to <br />this Agreement shall be made in writing signed by the parties. <br />IN WITNESS WHEREOF the McCanne Ditch and Reservoir Company has, by the <br />aurthority of its Board of Directors, caused this Agreement to be executed <br />by its President and attested by its Secretary and Ready Mixed Concrete Company <br />has, by the authority"of its Board of Directors, caused this Agreement to be <br />executed by Its President and attested by its Secretary. <br />DATED the day and year first written above. <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.