My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-19_REVISION - M1987049 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987049
>
2009-08-19_REVISION - M1987049 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:24:52 PM
Creation date
2/17/2016 12:18:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987049
IBM Index Class Name
REVISION
Doc Date
8/19/2009
Doc Name
Adequacy Review Response AR02
From
Hart Environmental
To
DRMS
Type & Sequence
AR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I 1/-11‘1 LIN V/I n V I V 1' 1 L 1 N 1`!--\ L. <br />P O. BOX 1 303 bolllaet, Colorado 80306 Phone. 303.4 14.0002 <br />August 10, 2009 <br />Mr. Al Trujillo <br />Senior Right -of -Way Specialist <br />United Power, Inc. <br />P.O. Box 929 <br />Brighton, CO 80601 <br />Re: Ready Mixed Concrete Company -Bromley Lakes Mining Impact Agreement <br />Dear Al: <br />My Client, Ready Mixed Concrete Company (RMCC) has applied to the Colorado <br />Division of Reclamation, Mining and Safety to amend their existing permit (No. M-1987- <br />049) to mine sand and gravel and reclaim a parcel of land located along Brighton Road in <br />parts of the South '/2 of the Southwest /4 of Section 13 and the Northwest 1/4 of the <br />Northwest '/4 of Section 24 all in Township 1 South, Range 67 West of the 6`h Principal <br />Meridian (PM) in Adams County, Colorado (see enclosed map). <br />The proposed sand and gravel mining operation will occur within 25 feet of <br />overhead electric power lines owned by United Power, Inc. and within 50 feet of the west <br />right-of-way of Brighton Road. Overhead lines located in the proposed mining area west <br />of Brighton Road serve houses now owned by RMCC. If it is determined that these <br />power lines are no longer needed RMCC will, with the consent of United Power, elect to <br />remove those lines prior to the start of mining. However, in the event that the power lines <br />are needed to serve your customers, RMCC will take every precaution to insure that the <br />lines are not damaged as a result of mining and reclamation activities or are relocated at <br />their expense. <br />Therefore, enclosed with this letter is an Agreement by which RMCC agrees to <br />repair or replace at its expense any damage to United Power's existing overhead power <br />line due to the proposed sand and gravel mining operation. If the language of the <br />enclosed Agreement is acceptable to United Power, Inc., please return a signed copy of it <br />to me at P.O. Box 1303 Boulder, CO 80306. <br />If you have any questions regarding this letter and the enclosed Agreement, please <br />do not hesitate to call me at (303) 444-6602 or if you prefer you can contact me by e-mail <br />at mjhart0l • gmail.com. <br />Sincerely, <br />End: <br />Cc: Bill Timmons, RMCC <br />Wetlands Bar±km4 <br />norronwurtal ,\ lanadrrnurt <br />Land List Plaunimi <br />Reclamation Uesim, <br />
The URL can be used to link to this page
Your browser does not support the video tag.