My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-19_REVISION - M1987049 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987049
>
2009-08-19_REVISION - M1987049 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:24:52 PM
Creation date
2/17/2016 12:18:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987049
IBM Index Class Name
REVISION
Doc Date
8/19/2009
Doc Name
Adequacy Review Response AR02
From
Hart Environmental
To
DRMS
Type & Sequence
AR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 <br />Ready Mixed - Erger's Pit/Ken Mitchell Lake Storage <br />SWSP Projected Replacements (May 2009 - July 2010) <br />all values in acre-feet <br />09-10 Total includes May 2009 through April 2010. <br />[1] Total Fulton water credited to the river, equal to NTP Col [9] + BL Col [17] + RMP1 Col [17]. <br />[2] Total Surplus Fulton Credits available. Equal to BL Col [20] + the greater of zero and RMPI Col [10] - RMPI Col [12]. <br />[3] Total Surplus Fulton HCU Delivered to Storage as reported by RMCC. <br />[4] Total Surplus Fulton HCU Delivered to River is the excess Fulton credits that were delivered to the River and not stored (+) or the over storage of Fulton credits (-). <br />Equal to [2] - [3]. <br />[5] Required Releases from storage to the River for all pits. Equal to the sum of the replacement requirement for all three pits minus the total Fulton water credited <br />directly to the river, (NTP Col [9] + BL Col [17] + RMPI Col [11]) - [1]. <br />[6] Actual Releases of RMCC water from Kenneth Mitchell Lake Storage to the River or another replacement release as reported by Brighton. <br />[7] Pumping from Erger's storage to Ken Mitchell storage. <br />[8] RMCC's portion of the Ken Mitchell Lake evaporation, estimated based upon storage projections provided by the City of Brighton. <br />[9] RMCC's cumulative storage in Brighton's Kenneth Mitchell Lake 1, equal to previous [8] + [3] - [6] + [7] - [8]. <br />[10] RMCC's lease of excess augmentation credits from SACWSD or another source. <br />[11] Total Remaining Replacement Requirement for all three pits. Equal to NTP [13) + BL [21] + RMPI [15]. <br />.... BBA <br />c t, nr u l t it n t k B, S 11 0 !' B R fi G f7 l ,y ASOC IA 1- l 5 ! N <br />Ii \0430 - Boral\Bromley/RMPI SWSP renewal 2.12.09 xis Ergers <br />2/27/2209 3 20 PM 3 AK <br />Total <br />Fulton HCU <br />Direct <br />To River <br />Total <br />Surplus <br />Fulton <br />HCU <br />Total Surplus <br />Fulton HCU <br />Delivered <br />To Storage <br />Total Surplus <br />Fulton HCU <br />Delivered <br />To River <br />Releases from <br />Storage to River <br />Pumping <br />from Erger's <br />to Ken <br />Mitchell <br />RMCC's <br />Ken <br />Mitchell <br />Evaporation <br />RMCC's <br />EOM Ken <br />Mitchell <br />Storage <br />Lease <br />Replacement <br />Remaining <br />Replacement <br />Requirement <br />Required <br />Actual <br />Month <br />[1] <br />[2] <br />[31 <br />[4] <br />[5] <br />[6] <br />[7] <br />[8] <br />[91 <br />[10] <br />11 L <br />May <br />16.1 <br />5.1 <br />5.1 <br />0 <br />0 <br />0 <br />0 <br />5.9 <br />81.6 <br />0 <br />0 <br />Jun <br />20.6 <br />11.2 <br />11.2 <br />0 <br />0 <br />0 <br />0 <br />7.2 <br />85.7 <br />0 <br />0 <br />Jul <br />23.1 <br />17.3 <br />17.3 <br />0 <br />0 <br />0 <br />0 <br />7.1 <br />95.8 <br />0 <br />0 <br />Aug <br />25.6 <br />6.3 <br />6.3 <br />0 <br />0 <br />0 <br />0 <br />6.4 <br />95.8 <br />0 <br />0 <br />Sep <br />14.9 <br />0 <br />0 <br />0 <br />10.7 <br />10.7 <br />0 <br />4.9 <br />80.3 <br />0 <br />0 <br />Oct <br />2.1 <br />0 <br />0 <br />0 <br />21.0 <br />21.0 <br />0 <br />3.0 <br />56.3 <br />0 <br />0 <br />Nov <br />0 <br />0 <br />0 <br />0 <br />26.3 <br />26.3 <br />0 <br />1.2 <br />28.7 <br />0 <br />0 <br />Dec '09 <br />0 <br />0 <br />0 <br />0 <br />22.5 <br />22.5 <br />0 <br />0.8 <br />5.4 <br />0 <br />0 <br />Jan'10 <br />0 <br />0 <br />0 <br />0 <br />5.0 <br />5.0 <br />0 <br />0.4 <br />0 <br />12.9 <br />0 <br />Feb <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />16.2 <br />0 <br />Mar <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />14.1 <br />0 <br />Apr <br />4.2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />8.8 <br />0 <br />May <br />16.9 <br />4.3 <br />4.3 <br />0 <br />0 <br />0 <br />0 <br />0 <br />4.3 <br />0 <br />0 <br />Jun <br />21.4 <br />10.5 <br />10.5 <br />0 <br />0 <br />0 <br />0 <br />5.3 <br />9.5 <br />0 <br />0 <br />Jul <br />23.8 <br />16.6 <br />16.6 <br />0 <br />0 <br />0 <br />0 <br />8.1 <br />18.0 <br />0 <br />0 <br />09-10 Total <br />108.9 <br />37.7 <br />37.7 <br />- <br />85.5 <br />85.5 <br />0 <br />- <br />52.0 <br />0 <br />SWSP Total <br />168.7 <br />71.3 <br />71.3- <br />85.5 <br />85.5 <br />0 <br />- <br />52.0 <br />0 <br />09-10 Total includes May 2009 through April 2010. <br />[1] Total Fulton water credited to the river, equal to NTP Col [9] + BL Col [17] + RMP1 Col [17]. <br />[2] Total Surplus Fulton Credits available. Equal to BL Col [20] + the greater of zero and RMPI Col [10] - RMPI Col [12]. <br />[3] Total Surplus Fulton HCU Delivered to Storage as reported by RMCC. <br />[4] Total Surplus Fulton HCU Delivered to River is the excess Fulton credits that were delivered to the River and not stored (+) or the over storage of Fulton credits (-). <br />Equal to [2] - [3]. <br />[5] Required Releases from storage to the River for all pits. Equal to the sum of the replacement requirement for all three pits minus the total Fulton water credited <br />directly to the river, (NTP Col [9] + BL Col [17] + RMPI Col [11]) - [1]. <br />[6] Actual Releases of RMCC water from Kenneth Mitchell Lake Storage to the River or another replacement release as reported by Brighton. <br />[7] Pumping from Erger's storage to Ken Mitchell storage. <br />[8] RMCC's portion of the Ken Mitchell Lake evaporation, estimated based upon storage projections provided by the City of Brighton. <br />[9] RMCC's cumulative storage in Brighton's Kenneth Mitchell Lake 1, equal to previous [8] + [3] - [6] + [7] - [8]. <br />[10] RMCC's lease of excess augmentation credits from SACWSD or another source. <br />[11] Total Remaining Replacement Requirement for all three pits. Equal to NTP [13) + BL [21] + RMPI [15]. <br />.... BBA <br />c t, nr u l t it n t k B, S 11 0 !' B R fi G f7 l ,y ASOC IA 1- l 5 ! N <br />Ii \0430 - Boral\Bromley/RMPI SWSP renewal 2.12.09 xis Ergers <br />2/27/2209 3 20 PM 3 AK <br />
The URL can be used to link to this page
Your browser does not support the video tag.