My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-17_INSPECTION - C1981022
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981022
>
2016-02-17_INSPECTION - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:19 PM
Creation date
2/17/2016 12:17:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Inspection
Doc Date
2/17/2016
Doc Name
Inspection Report
From
DRMS
To
Oxbox Mining, LLC
Inspection Date
2/4/2016
Email Name
LDS
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 4, 2016 C-1981-022/Elk Creek Mine LDS <br />Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br />N - Air Resource Protection R - Roads <br />N - Availability of Records R - Reclamation Success <br />N - Backfill & Grading N - Revegetation <br />N - Excess Spoil and Dev. Waste N - Subsidence <br />N - Explosives N - Slides and Other Damage <br />N - Fish & Wildlife N - Support Facilities On-site <br />N - Hydrologic Balance N - Signs and Markers <br />R - Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br />N - Other N - Special Categories Of Mining <br />N - Processing Waste N - Topsoil <br />COMMENTS <br />This was a partial inspection by Leigh Simmons of the Division of Reclamation, Mining and Safety <br />(Division). Doug Smith of Oxbow Mining accompanied the inspection. The weather was mostly clear with deep <br />snow on the ground. Although the roads around the site were mostly accessible, the snow limited the scope of the <br />inspection. <br />The status of the Elk Creek Mine, as far as the Division is concerned, is "Active" however no coal is being <br />mined and the activity since the last inspection has been focused on the early stages of site reclamation. <br />The MSHA status of the mine is "Temporarily Idled" <br />GENERAL MINE PLAN COMPLIANCE: <br />There are no revisions in process. The mine site is being reclaimed in accordance with the plan. <br />ROADS — Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3); Drainage 4.03.1(4)/4.03.2(4); Surfacing and Maintenance 4.03.1(5) and <br />(6)/4.03.2(5) and (6); Reclamation 4.03.1(7)/4.03.2(7): <br />Road access was maintained up Elk Creek (by Oxbow) and up Bear Creek (by Gunnison Energy). The <br />road up Hubbard Creek was not accessible. <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />The demolition contractors, Demco, and their sub -contractors were on-site. At the time of the inspection <br />they were working on removing the gravel cone from the bottom of the large concrete silo, and loading steel onto <br />trucks to ship to a scrap merchant in Montrose. <br />DOCUMENTS RECEIVED <br />N/A <br />OTHER (SPECIFY) <br />N/A <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.