My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-15_REPORT - M1987049
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1987049
>
2009-10-15_REPORT - M1987049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:12 PM
Creation date
2/17/2016 12:16:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987049
IBM Index Class Name
REPORT
Doc Date
10/15/2009
Doc Name
Cost Summary Form
From
DRMS
To
Bromley Lakes
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name • Colorado Division Of Reclamation, Mining And Safety <br />Task # • 006 State . Colorado <br />Permit/job # :M-1987-049 <br />Date . 10/14/2009 County :Adams Abbreviation :none <br />User • JLE Site : Bromley Lakes <br />Permit or other job action :AM02, Bond Estimate <br />Filename : M049-006 <br />Task description .Backfill the remainder of 11.7 acre wetland/pond area with OB from Ergers <br />HOURLY EQUIPMENT COST <br />Equipment Description <br />Shift basis : 1 per day <br />Truck/loader team -Truck • <br />-Loader • <br />Cat 773D (2002) <br />CAT 990 Senes 11 (2005) <br />Support equipment -Load area . <br />-Dump area <br />NA <br />NA <br />Road maintenance -Motor grader • <br />-Water truck . <br />CAT 16H <br />Water Tanker, 5,000 Gal <br />Cost Breakdown : <br />Truck/Loader <br />Truck <br />Work Team <br />Loading Tool <br />Support Equipment <br />Load Area <br />Dump Area <br />Road Maintenance <br />Motor Grader <br />Equipment <br />Water Truck <br />Import data filename : <br />truck2 <br />loader <br />NA <br />NA <br />grader <br />misctruk <br />% Utilization -machine : <br />100 <br />100 <br />NA <br />NA <br />20 <br />20 <br />-Ripper attachment . <br />NA <br />NA <br />NA <br />NA <br />1 <br />NA <br />Ownership cost/hour <br />$59 93 <br />$106 16 <br />NA <br />NA <br />$56 68 <br />$22 75 <br />Operating cost/hour <br />$118.39 <br />$145 06 <br />NA <br />NA <br />$15 85 <br />$9 45 <br />Ripper op. cost/hour <br />NA <br />NA <br />NA <br />NA <br />$0 00 <br />$0 00 <br />Operator cost/hour . <br />$25 88 <br />$38 72 <br />NA <br />NA <br />$38 91 <br />$38 70 <br />Unit subtotals . <br />Number of units <br />$204 20 <br />$289 95 <br />NA <br />NA <br />$111 44 <br />$70 91 <br />3 <br />1 <br />0 <br />0 <br />1 <br />1 <br />Group subtotals : <br />Work • $902 55 <br />Support : $0 00 <br />Maintenance • $182.34 <br />MATERIAL QUANTITIES <br />Initial <br />volume • 41.551 <br />LCY <br />Swell <br />factor : <br />Total work team cost/hour . $1,084.89 <br />NA <br />Loose <br />volume • 41,551 LCY <br />Source of quantity take -off :Amount of Matenal needed to backfill pit <br />Source of estimated swell factor • NA <br />Material purchase cost <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis • <br />$0 00 /LCY <br />Total cost : $0 <br />Truck Bed (volume) Basis : <br />Material weight : 2.100 <br />Descr. . Earth - Loam <br />pounds/LCY <br />Rated payload : 108,060 pounds <br />Payload capacity : 51 46 LCY <br />Struck volume <br />Heaped volume : <br />Average volume : <br />Adjusted volume*: <br />Final truck volume based on number of loader passes : <br />* truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity : <br />Rated capacity (nom. heaped) • 11 250 LCY <br />Descr : Other - rock/dirt mixtures (100-120%) <br />Bucket fill factor • 1 100 <br />Adjusted bucket capacity : 12.375 LCY <br />33 80 <br />45 90 <br />39 85 <br />45 90 <br />37.13 <br />LCY <br />LCY <br />LCY <br />LCY <br />LCY <br />Job Condition Corrections : Site altitude (ft.) : 4,980 <br />Altitude adj. . <br />Truck <br />Loader Source <br />1 000 <br />1 000 <br />Job efficiency : <br />0 830 <br />0 830 <br />(Cat HB) <br />(1 shift/day) <br />Net correction : <br />0.830 <br />0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.