Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description <br />Total <br />Cost/hour/unit <br />Fleet Size <br />(No. units) <br />Haul Trip <br />Cost/hr/fleet <br />Return Trip <br />Cost/hr/fleet <br />Subtotals : <br />$0.00 <br />$0.00 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Transportation Cycle Time : Non- <br />Roadable <br />Equipment <br />0.04 <br />Haul time (hours) = <br />Return time (hours) = <br />Loading time (hours) = <br />Unloading time (hours) = <br />Subtotals = <br />JOB TIME AND COST <br />Nearest major city or town within project area region : Brighton <br />Roadable <br />Equipment <br />0.04 <br />0.04 <br />0 04 <br />1.00 <br />NA <br />0.50 <br />NA <br />1.57 <br />0 07 <br />Total one-way travel distance : <br />Average travel speed : <br />2.0 miles <br />55 0 mph <br />Total non-roadable mob/demob cost * : $17,872 11 <br />*two round trips with haul rig <br />Total roadable mob/demob cost ** : $0.00 <br />** one round trip, no haul rig <br />Total job time : 3.15 hours <br />Total job cost : $17,872 <br />