Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : 012 <br />Date : 10/14/2009 <br />User : JLE <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State : Colorado <br />County :Adams <br />Site • Bromley Lakes <br />Permit/job# : M-1987-049 <br />Abbreviation : none <br />Filename : M049-012 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :AM02, Bond Estimate <br />Task description : Spreading toposil over 40 acres of disturbance in expansion area <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : 64,533 <br />Basic machine <br />Blade type <br />Attachment no. 1 <br />Attachment no. 2 <br />:Cat D9R - 9SU (2005) Horsepower : 405 <br />:Semi -Universal <br />:ROPS Cab <br />:3 -shank ripper <br />Ownership cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />LCY <br />Swell <br />factor : <br />$67.84 <br />Utilization % <br />NA <br />$126.03 100 <br />$0.87 <br />10 <br />$38.54 <br />NA <br />$233.27 <br />NA <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : $466.55 <br />Loose <br />volume : 64,533 LCY <br />Source of estimated volume :Estimate based off 40 acres of disturbance at a time <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Average push distance : 200 feet <br />Unadjusted hourly production : 700.0 LCY/hr <br />Material consistency description : <br />Consolidated stockpile <br />Average push gradient : 0.00 % (neg) <br />Average site altitude : 4,980 feet <br />Material weight : <br />Weight description : <br />Top Soil <br />1,600 lbs/LCY <br />JOB TIME AND COST <br />Fleet size : <br />Unit cost : <br />2 Dozer(s) <br />$0.466 /LCY <br />Job Condition Correction Factors Source <br />Operator skill : 0.75 (avg ) <br />Material consistency : 1 00 (Cat HB) <br />Dozing method : 1 00 (gen ) <br />Visibility : 1.00 (avg ) <br />Job efficiency : 0 83 (lshift/day) <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1 00 (Cat HB) <br />Material weight : 1 44 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.71 <br />Adjusted unit production : 500.40 LCY/hr <br />Adjusted fleet production : 1,00019 LCY/hr <br />Total job time : 64.48 <br />Total job cost : $30,084 <br />Hours <br />