Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task no.: 007 <br />Date : 10/14/2009 <br />User : JLE <br />CIRCES Cost Estimating Software <br />PUMPING WORK <br />State : Colorado <br />County :Adams <br />Site :Bromley Lakes <br />Permit/job no. : M-1987-049 <br />Abbreviation : none <br />Filename :M049-007 <br />Agency or organization name Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :AM02, Bond Estimate <br />Task description : Pumping Cell No. 3 <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />Ownership cost/hour : <br />Operating cost/hour : <br />Operator cost/hour : <br />Total cost/hour : <br />Job Utilization : <br />$60.03 NA <br />$64.93 100 % <br />$50.12 <br />$175.08 <br />PUMPING QUANTITIES <br />Initial pond <br />volume : 1,430.00 acre feet <br />Total pond inflow surface <br />area : 1 <br />sq. ft. <br />NA <br />Conversion <br />Job shift basis : 1 per day <br />Horsepower : 70 <br />Weight (UST) : 1 95 <br />Total fleet cost/hour : $175.08 <br />Final pond <br />factor : 325,850 5800 volume : 465,966,329 gallons <br />Unit inflow rate in Total pond inflow volume <br />gph/sq. ft. : 0.0879 per hour : 0.09 gph <br />Source of volume estimate :Adequacy Review 10-05-09 <br />PUMPING TIME <br />Maximum pump capacity . <br />Estimated suction head : <br />Estimated discharge head : <br />Total head : <br />CPB pump capacity : <br />Site altitude : <br />70 gph/pump <br />10 feet <br />15 feet <br />25 feet <br />93,000 gph/pump <br />4,980 feet <br />Inflow as % of pond volume : NA <br />JOB TIME AND COST <br />Unit cost : $0.000706 per gallon <br />Adjusted pumping capacity : 279,000 gph <br />nitial unadjusted pumping time 1,670.13 hours <br />Inflow during initial pumping : <br />Net unadjusted pumping time : 1,670.13 hours <br />Altitude adjustment factor : 1.0309 (3% rule) <br />Pump efficiency factor : 1 0909 (55 min /hr.) <br />Total adjusted pumping time : 1,878.29 hours <br />147 gallons <br />Total job time : 1878.29 hours <br />Total job cost : $328,854 <br />Description <br />Quantity <br />Data <br />Source <br />Pump : <br />Centrifugal pump - 200M, 10 in. <br />3 <br />(CRG) <br />Suction hose : <br />Suction pipe - 10 in. diam., 25 ft. <br />6 <br />(CRG) <br />Discharge hose : <br />Discharge pipe - 10 in. D., 25 ft. <br />33 <br />(CRG) <br />Labor .Pump <br />operator <br />2 <br />(CDOT/RSM) <br />Cost Breakdown : <br />Ownership cost/hour : <br />Operating cost/hour : <br />Operator cost/hour : <br />Total cost/hour : <br />Job Utilization : <br />$60.03 NA <br />$64.93 100 % <br />$50.12 <br />$175.08 <br />PUMPING QUANTITIES <br />Initial pond <br />volume : 1,430.00 acre feet <br />Total pond inflow surface <br />area : 1 <br />sq. ft. <br />NA <br />Conversion <br />Job shift basis : 1 per day <br />Horsepower : 70 <br />Weight (UST) : 1 95 <br />Total fleet cost/hour : $175.08 <br />Final pond <br />factor : 325,850 5800 volume : 465,966,329 gallons <br />Unit inflow rate in Total pond inflow volume <br />gph/sq. ft. : 0.0879 per hour : 0.09 gph <br />Source of volume estimate :Adequacy Review 10-05-09 <br />PUMPING TIME <br />Maximum pump capacity . <br />Estimated suction head : <br />Estimated discharge head : <br />Total head : <br />CPB pump capacity : <br />Site altitude : <br />70 gph/pump <br />10 feet <br />15 feet <br />25 feet <br />93,000 gph/pump <br />4,980 feet <br />Inflow as % of pond volume : NA <br />JOB TIME AND COST <br />Unit cost : $0.000706 per gallon <br />Adjusted pumping capacity : 279,000 gph <br />nitial unadjusted pumping time 1,670.13 hours <br />Inflow during initial pumping : <br />Net unadjusted pumping time : 1,670.13 hours <br />Altitude adjustment factor : 1.0309 (3% rule) <br />Pump efficiency factor : 1 0909 (55 min /hr.) <br />Total adjusted pumping time : 1,878.29 hours <br />147 gallons <br />Total job time : 1878.29 hours <br />Total job cost : $328,854 <br />