My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-16_INSPECTION - C1980007
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1980007
>
2016-02-16_INSPECTION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:18 PM
Creation date
2/17/2016 9:37:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Inspection
Doc Date
2/16/2016
Doc Name
Inspection Report
From
DRMS
To
Mountain Coal Company, LLC
Inspection Date
2/4/2016
Email Name
LDS
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 4, 2016 C-1980-007/West Elk Mine LDS <br />Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA Not Applicable <br />N - Air Resource Protection R - Roads <br />N - Availability of Records N - Reclamation Success <br />N - Backfill & Grading N - Revegetation <br />N - Excess Spoil and Dev. Waste N - Subsidence <br />N - Explosives N - Slides and Other Damage <br />N - Fish & Wildlife Y - Support Facilities On-site <br />Y - Hydrologic Balance Y - Signs and Markers <br />R - Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br />N - Other N - Special Categories Of Mining <br />N - Processing Waste N - Topsoil <br />COMMENTS <br />This was a partial inspection by Leigh Simmons of the Division of Reclamation, Mining and Safety <br />(Division). Jessica Loveland of Mountain Coal Company (MCC) accompanied the inspection. The weather was <br />cloudy with deep snow on the ground. The site was accessible, but the deep snow cover limited the scope of the <br />inspection. <br />The mine was actively mining, processing and shipping coal. <br />On January 15, the 11 -day extension to the original 45 -day comment period for the Colorado Roadless <br />Rule Supplemental Draft Environmental Impact Statement closed. The Forest Service is expected to revise the <br />supplemental environmental impact statement and publish a supplemental final environmental impact statement in <br />the spring or summer of 2016. <br />GENERAL MINE PLAN COMPLIANCE: <br />The project to construct ramps to access the B -Seam was proceeding as expected. <br />MR416, which updates the list of officers and directors, was approved on February 1, 2016. No <br />comments were received before the deadline of February 11, 2016. <br />MR -415, which updates and reformats sections 1.0-2.03 of the PAP, was approved on February 8, 2016. <br />The deadline for comments is February 18, 2016. <br />SL -09 is complete, but further action is delayed until the snowpack has melted sufficiently to allow an <br />inspection. <br />RN -07 was found complete on February 1, 2016. It is currently under review by the Division. The initial <br />adequacy review is due by April 1, 2016. <br />ROADS — Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3); Drainage 4.03.1(4)/4.03.2(4); Surfacing and Maintenance 4.03.1(5) and <br />(6)/4.03.2(5) and (6); Reclamation 4.03.1(7)/4.03.2(7): <br />Roads around the site were accessible. Snow clearing had been carried out with dozers as the snow had <br />been too heavy for the regular plow trucks to operate. <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.