My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-16_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-02-16_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:18 PM
Creation date
2/17/2016 8:01:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
2/16/2016
Doc Name
Weekly QA Report
From
Newmont
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK &VICTOR GOLD MINE <br /> NEWMONT MINING CO. amec <br /> SQUAW GULCH VLF WEEKLY REPORT foster <br /> wheeler <br /> ATTACHMENT A <br /> Amec Foster Wheeler-2016 CQA Field Staff Schedule MLE2 <br /> Name Sun Mon Tues Wed Thurs Fri Sat <br /> Jan 10 Jan 11 Jan 12 Jan 13 Jan 14 Jan 15 Jan 16 <br /> Bobby Redd PR PR PR PR <br /> Tyler Browning ST ST ST ST <br /> Rick Buxton LT LT LT LT LT <br /> Shawn Wisely UG UG UG UG <br /> Steve Rice UG UG UG <br /> Andrea Meduna PE <br /> LEGEND: <br /> UM = Unit Manager <br /> PM = Project Manager <br /> PCE = Project Certifying Engineer <br /> PE = Project Engineer <br /> PR= Project Resident <br /> LG = Lead Geosynthetics Engineer <br /> LS = Lead Soils Technician <br /> ST= Soil Technician <br /> LT= Laboratory Technician <br /> GL= Geosynthetics Lead <br /> GT= Geosynthetics Technician <br /> FLM= Field/Laboratory Manager <br /> UG = Underground Working Remediation <br /> SE = Senior Engineer <br /> GS= Geophysics Survey Geologist <br /> HY= Highway Design Engineer <br /> WI =Welding Inspector <br />
The URL can be used to link to this page
Your browser does not support the video tag.