CRIPPLE CREEK &VICTOR GOLD MINE �. <br /> NEWMONT MINING CO. amec <br /> SQUAW GULCH VLF WEEKLY REPORT foster <br /> wheeler <br /> Drain Cover Fill: <br /> None. <br /> Rip Rap: <br /> None. <br /> Underground Workings: <br /> Confirmatory Drilling: <br /> UG#6617: Sandvik 700— 10.0 hours, 1200LF. Further remediation required. <br /> UG#6477: Sandvik 700—26.0 hours, 2250LF. Further remediation required. <br /> UG#6478: Sandvik 700— 1.0 hour, 250LF. Further remediation required. <br /> Remediation: <br /> UG#6673: Completed placement of second and third geogrid layers. Completed <br /> placement of second and third 6-inch lifts of Select Structural Fill. Structural backfill was <br /> placed to bring slope to design grade. Remediated. <br /> UG#6692: Located possible stope during cut. A Cat excavator excavated 15+!-feet <br /> encountering mining activity. Further remediation required after remainder of cut is <br /> removed. T&M = 1.5 hours. <br /> UG#6531: A Cat excavator removed shot rock in preparation for geogrid subgrade. <br /> Further remediation required. <br /> UG#6538: A Cat excavator removed shot rock in preparation for geogrid subgrade. <br /> Further remediation required. <br /> UG#6455: A Cat excavator removed shot rock in preparation for geogrid subgrade. <br /> Further remediation required. <br /> Underdrain System: <br /> Primary Underdrain: Complete. <br /> Secondary Underdrain: None. <br /> Tertiary Underdrain: None. <br /> Leak Detection: <br /> Cat haul trucks, a Cat excavator and a Cat skidsteer removed snow and placed SLF between <br /> stations HM20+00 to HM17+00 in preparation for leak detection construction. <br /> Geomembrane: <br /> None. <br /> Miscellaneous: <br /> Perimeter signage installed to delineate Phase 1 geomembrane extents installed to date. <br /> II) Storm Water Management <br /> Best Management Practices (BMPs)continued to be performed. <br />