Laserfiche WebLink
Description of works, including method: V� <br />A track hoe will be used to initially clean up the frozen seep material, loading the material into <br />multiple sealed containers supplied by the Twin landfill. The track hoe will eventually excavate <br />at a slow rate to try and locate the source of the seep, using a metal detector as the excavation <br />progresses. Any deep excavation shall be benched at a minimum 2:1 slope. <br />Site Sketch: <br />Note that an 8-12" water line is located under the area of the sweep — highlighted in red in the <br />screen capture below. <br />; Check overhead for any power lines. None are believed to be buried in the area. <br />A 1000 -gallon propane tank is located just east of the load -out reclaim tunnel, possibly buried <br />In the snow. The tank will need uncovered and the valve on the top of the tank shut off as a <br />to 1" buried propane line may exist in the area. <br />POND G <br />(SAE) <br />/ SY/ <br />I <br />�r <br /># k ',��r <br />24'CMf' VEGETATIVE FILTER <br />OVERLAND BELT <br />SMALL AREA <br />5E[P EXEMPTION (SAE) <br />TRANSFORMER <br />BATCH WEIGH LOAfIOLR <br />ACCESS ROAD <br />' 3 \ SU55TATION <br />RECLAIM BELT <br />TRUCK LOADOUT <br />ReCLAIM CONVEYOR <br />Page 2 of 3 <br />