Laserfiche WebLink
6 (FORM 2 -Public filing) <br /> 8. Describe the estimated topsoil depth and how topsoil will be salvaged,stockpiled and redistributed for the re-establishment of <br /> vegetation. Specify approximate topsoil redistribution depth: <br /> No topsoil will be salvaged on the historically disturbed areas as none is present. Topsoil is <br /> expected to be between 6 and 18 inches thick near the culvert installation, and will be <br /> salvaged or use in reclaiming the area. I his reclamation will occur immediately following <br /> the J QIIQ lIVl1 V <br /> f the eu'vert. <br /> 9. Describe how drill holes will be plugged(refer to Rule 5.4 of the Rules for required abandonment procedures): <br /> Any underground exploration drillholes will be capped in accordance with Rule 5.4.2(5). <br /> None are planned as part of this NOI. All drilling is for blasting purposes. <br /> 10. Describe how portals, adits,shafts,ponds,excavations,or other disturbances will be reclaimed(refer to Rule 3 and Rule 5 for <br /> specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br /> The portal will be backfilled with waste rock to a depth of 40'. <br /> 11. Describe how roads will be reclaimed or returned to their pre-prospecting(or better)condition: <br /> SOAGO the prospeGting OperatiGAS Well improve the existing roads, AG additional work on the <br /> roads will be conducted following completion of prospection operations. <br />