Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Final Reclamation <br /> North Taft Hill Expansion Permit Action: <br /> Site: Site Final Reclamation Permit/Job#: M2001051 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 2/12/2016 County: Larimer Filename: M051-001 <br /> User: ECS <br /> Agency or organization name: DRMS <br /> TASK LIST (DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Existing Reclamation Bond NA 1 1.00 $470,124.00 <br /> 002 Slurry wall bond for exposed GW area(4540'x20' NA 1 1.00 $272,400.00 <br /> x$3s ft <br /> SUBTOTALS: 2 $742,524 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $14,998.98 <br /> Performance bond: 1.05 Total= $7,796.50 <br /> Job superintendent: 0.00 Total= $0.00 <br /> Profit: 10.00 Total= $74,252.40 <br /> TOTAL O&P= $97,047.88 <br /> CONTRACT AMOUNT(direct+O&P)= $839,571.88 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 500.00 Total= 500.00 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $35,681.80 <br /> Reclamation management and/or administration: 5.00 $41,978.59 <br /> CONTINGENCY: 3.00 Total= $22,275.72 <br /> TOTAL INDIRECT COST= $197,484.00 <br /> TOTAL BOND AMOUNT(direct+indirect)= $940,008.00 <br />