My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-17_REPORT - M2008025
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2008025
>
2016-02-17_REPORT - M2008025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:20 PM
Creation date
2/16/2016 11:30:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008025
IBM Index Class Name
Report
Doc Date
2/17/2016
Doc Name
Annual report/fee/ map
From
Tim Kunau
To
DRMS
Annual Report Year
2016
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acres <br />backfilled: <br />Total .: es <br />seeder / <br />appr,v•d mix: <br />.. acres <br />/top oil <br />repla.-d: <br />Total acres <br />mulched w/ <br />approved mulch: <br />Total acres <br />graded: <br />Tot. . res <br />fe r ili -d w/ <br />a-,vd -rah er: <br />/ <br />To. s.' <br />repla ement <br />dept (in.): <br />Mulch application <br />rate (tons/ac): <br />Seed <br />application <br />method: <br />ertilizer / <br />application <br />method: <br />Mulch <br />application <br />method: <br />�- <br />13. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO <br />If "YES", indicate the weed species, control area, control type, application rate and treatment date on the re <br />14. Is adequate topsoil reserved for reclamation, based on your approved permit? <br />If "NO", please explain: <br />15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? <br />If "NO" please explain: <br />N/A <br />YES NO N/A <br />NO N/A <br />P. <br />16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of u - ate <br />Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO <br />17. Are all hazardous materials stored within approved spill containment structures? <br />18. Is your financial warranty value sufficient to cover the cost to complete reclamation? <br />19. Is your basis for legal right to enter still valid? <br />20. Does your permit require you to submit monitoring information annually? <br />If "Yes", please attach the required monitoring results to this Annual Report. <br />YES NO <br />NO N/A <br />NO <br />YES <br />21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br />Construction Materials (C.R.S. 34-32-116 or 34-32.5-116), attach a map to this report that accurately depicts the permit <br />boundary, current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br />MAP ATTACHED: <br />
The URL can be used to link to this page
Your browser does not support the video tag.