My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-08_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2016-02-08_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:08 PM
Creation date
2/16/2016 10:45:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
2/8/2016
Doc Name
Memo & Cost Estimate
From
Jason Musick
To
Brock Bowles
Type & Sequence
SL17
Email Name
JDM
DIH
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task # 000 <br />MOTOR GRADER WORK <br />Task description: Construct roadside ditches on reconstructed BB Road <br />Site: New Horizon Mine Permit Action: SL17 <br />PROJECT IDENTIFICATION <br />Page 13 of 16 <br />Permit/Job#: C1981008 <br />Task #: 094 State: Colorado Abbreviation: None <br />Date: 2/8/2016 County: Montrose Filename: C008-094 <br />User: JDM <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14M <br />Ripper Attachment: <br />Cost Breakdown: <br />Horsepower: 259 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Total Fleet Cost/Hour: $136.37 <br />MATERIAL OUANTITIES <br />Total Area to be graded or ripped: 4.40 <br />Utilization % <br />Ownership Cost/Hour: <br />$42.03 NA <br />Operating Cost/Hour: <br />$13.98 20 <br />Ripper Operating Cost/Hour: <br />$0.00 <br />Operator Cost/Hour: <br />$24.47 NA <br />Total Unit Cost/Hour: <br />$80.47 <br />Total Fleet Cost/Hour: $136.37 <br />MATERIAL OUANTITIES <br />Total Area to be graded or ripped: 4.40 <br />acres <br />Source of estimated acreage: 6,4001.f., 15' wide each <br />side <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />1.75 <br />mph <br />Selected Application: <br />Ditch building/cleaning (0-3 mph) - 1.75 <br />Selected Blade Angle: <br />45 <br />degrees <br />Effective Blade Length: <br />9.90 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />7.90 <br />feet <br />Unadjusted Hourly Unit Production: <br />1.6758 <br />acres/hour <br />Job Condition Correction Factors <br />Site <br />Altitude: 5700 feet <br />Source <br />Altitude Adj: 1.00 CAT HB) <br />Job Efficiency: 0.80 (1sh/d, adv.) <br />Net Correction: 0.8000 multiplier <br />Adjusted Hourly Unit Production: <br />1.3406 <br />acres/Hour <br />Adjusted Hourly Fleet Production: <br />1.3406 <br />acres/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Total job time: <br />16.41 Hours <br />Unit cost: $60.03 per acre <br />Total job cost: <br />$1,321 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.