My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-08_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2016-02-08_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:08 PM
Creation date
2/16/2016 10:45:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
2/8/2016
Doc Name
Memo & Cost Estimate
From
Jason Musick
To
Brock Bowles
Type & Sequence
SL17
Email Name
JDM
DIH
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: New Horizon Mine <br />PROJECT IDENTIFICATION <br />Task #: 089 <br />Date: 2/8/2016 <br />User: JDM <br />BULLDOZER WORK <br />5th Street surface material <br />Permit Action: SL17 <br />State: Colorado <br />County: Montrose <br />Permit/Job#: C1981008 <br />Abbreviation: None <br />Filename: C008-089 <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EOUIPMENT COST <br />Basic Machine: Cat 139T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi -Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: $72.57 <br />NA <br />Operating Cost/Hour: $143.16 <br />100 <br />Ripper op. Cost/Hour: $0.00 <br />0 <br />Operator Cost/Hour: $38.01 <br />NA <br />Total unit Cost/Hour: $253.73 <br />Total Fleet Cost/Hour: $253.73 <br />MATERIAL QUANTITIES <br />Initial Volume: 4,080 <br />Swell factor: 1.000 <br />Loose volume: 4,080 LCY <br />Source of estimated volume: 1,5301.£ x 30'w x 2'd x 1.2 swell factor <br />Source of estimated swell Division estimate <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />50 feet <br />2,110.5 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push 0% <br />gradient: <br />Average site altitude: 5,700 feet <br />Material weight: 2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />
The URL can be used to link to this page
Your browser does not support the video tag.