Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 20 of 28 <br />CIRCES Cost Estimating Software <br />excavated pit - <br />Max. 200 ft. push <br />- Footing <br />1.5'x3'x50 LF <br />Demo. and on-site <br />50.00 <br />LF <br />$10.08 <br />$504.05 <br />disposal in <br />excavated pit, 1.5 <br />ft. x 3 ft. - Max. <br />200 ft. push <br />Primary Stacker <br />100'x3'x10' <br />Bldg. (MN) <br />3,000.00 <br />CF <br />$0.22 <br />$657.00 <br />to Lump Pile <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 200 ft. push <br />- Footing <br />1.5'x3'x50 LF <br />Demo. and on-site <br />50.00 <br />LF <br />$10.08 <br />$504.05 <br />disposal in <br />excavated pit, 1.5 <br />ft. x 3 ft. - Max. <br />200 ft. push <br />Truck Dump <br />24'xl8'xl4' <br />Bldg. (MN) <br />6,048.00 <br />CF <br />$0.22 <br />$1,324.51 <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 200 ft. push <br />CMP #2 <br />12"x25 LF <br />Pipe, corrugated <br />25.00 <br />LF <br />$2.30 <br />$57.50 <br />metal (CMP) - 12 <br />in. diameter pipe <br />CMP #3 and <br />18"x95 LF <br />Pipe, corrugated <br />95.00 <br />LF <br />$2.46 <br />$233.70 <br />CMP #4 <br />metal (CMP) - 18 <br />in. diameter pipe <br />Principle <br />12"x80 LF <br />Pipe, corrugated <br />80.00 <br />LF <br />$2.30 <br />$184.00 <br />Spillway at <br />metal (CMP) - 12 <br />Sediment Pond <br />in. diameter pipe <br />Truck Dump to <br />180 LF <br />Conveyor, <br />180.00 <br />LF <br />$17.60 <br />$3,168.00 <br />Primary <br />overland, <br />Conveyor <br />including supports <br />-5ft.Wx 6ft.H <br />housing <br />Primary to <br />80 LF <br />Conveyor, <br />80.00 <br />LF <br />$17.60 <br />$1,408.00 <br />Secondary <br />overland, <br />Conveyor <br />including supports <br />-5ft.Wx 6ft.H <br />housing <br />Primary to <br />100 LF <br />Conveyor, <br />100.00 <br />LF <br />$17.60 <br />$1,760.00 <br />Transfer <br />overland, <br />Conveyor <br />including supports <br />-5ft.Wx 6ft.H <br />housing <br />Crusher to <br />80 LF <br />Conveyor, <br />80.00 <br />LF <br />$17.60 <br />$1,408.00 <br />Secondary <br />overland, <br />Conveyor <br />including supports <br />-5ft.Wx 6ft.H <br />housing <br />Secondary to <br />46 LF <br />Conveyor, <br />46.00 <br />LF <br />$17.60 <br />$809.60 <br />Transfer <br />overland, <br />Conveyor <br />including supports <br />-5ft.Wx 6ft.H <br />housing <br />Reclaim <br />60 LF <br />Conveyor, <br />60.00 <br />LF <br />$17.60 <br />$1,056.00 <br />Conveyor <br />overland, <br />CIRCES Cost Estimating Software <br />