My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-16_REVISION - C1983059
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1983059
>
2016-02-16_REVISION - C1983059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:18 PM
Creation date
2/16/2016 9:50:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
Revision
Doc Date
2/16/2016
Doc Name
Midterm Review Findings & Cost Estimate
From
DRMS
To
Terror Creek, LLC
Type & Sequence
MT7
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT <br />SCRAPER TEAM WORK <br />Page 14 of 28 <br />Task description: Replace Topsoil from Stockpile to Site <br />Site: Terror Creek Loadout Permit Action: 2016 Midterm Review Permit/Job#: C1983059 <br />PROJECT IDENTIFICATION <br />Task #: 11A State: Colorado <br />Date: 2/16/2016 County: Delta <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 623G <br />-Dozer: NA <br />Abbreviation: None <br />Filename: C059 -11A <br />COSTShift basis: 1 per day <br />Support Equipment -Load Area: <br />-Dump Area: <br />NA <br />NA <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />NA <br />NA <br />Cost Breakdown: Scraper Work Team Sunnort Eauinment Maintenance Eauimnent <br />Total work team cost/hour: $244.72 <br />MATERIAL OUANTITIES <br />Initial volume: 5,243 CCY Swell factor: 1.125 <br />Loose volume: 5,898 LCY <br />Source of estimated volume: Map 5; Page 2.05-5R <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$83.28 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$127.20 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$34.24 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$244.72 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />1 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$244.72 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $244.72 <br />MATERIAL OUANTITIES <br />Initial volume: 5,243 CCY Swell factor: 1.125 <br />Loose volume: 5,898 LCY <br />Source of estimated volume: Map 5; Page 2.05-5R <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />CIRCES Cost Estimating Software <br />Scraper Bowl (volume)Basis: <br />Material weight: <br />2,550 lbs/LCY <br />Struck Volume: <br />18.00 <br />LCY <br />Material description: <br />Earth - Dry packed <br />Heaped Volume: <br />23.00 <br />LCY <br />Rated Payload: <br />55,200 pounds <br />Average Volume: <br />20.50 <br />LCY <br />Payload Capacity: <br />21.65 LCY <br />Adjusted Capacity: <br />20.50 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.