My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-08_GENERAL DOCUMENTS - C1981028
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981028
>
2016-02-08_GENERAL DOCUMENTS - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:07 PM
Creation date
2/11/2016 11:03:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
General Documents
Doc Date
2/8/2016
Doc Name
Proposed Decision & Findings (SL8)
From
DRMS
To
Coors Energy Company
Permit Index Doc Type
Findings
Email Name
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1. SL -08 Reclamation Cost Estimate Summary <br />Task Task Description <br />Task <br />Hours <br />Direct Cost <br />A Backfilling and Grading <br />330.8 <br />$610,991.00 <br />B Highwall Reduction; Blasting Cost <br />0 <br />$0.00 <br />C Rip and Regrade Haul and Access Roads <br />9.39 <br />$2,208.00 <br />D Regrade Impoundments and Diversions <br />0 <br />$0.00- <br />E Topsoil Replacement Cost <br />208.38 <br />$449,069.00 <br />F Revegetation Costs <br />182.31 <br />$100,142.00 <br />G Structure Demolition <br />8 <br />$3,885.03 <br />H Borehole Sealing <br />16 <br />$6,332.00 <br />1 Site Maintenance; Rill and Gully Repair and Pond Cleaning 121.38 <br />$31,421.00 <br />J Mobilization and Demobilization <br />15.6 <br />$28,271.00 <br />Total Hours and Direct Cost <br />891.86 <br />$1,232,319.03 <br />Indirect Cost Summary <br />Overhead and Profit <br />Liability Insurance 2.02% of Direct Cost <br />2.02% <br />$24,892.84 <br />Performance Bond 1.05% of Direct Cost <br />1.05% <br />$12,939.35 <br />Job Superintendent cost/hour time 50% of total task hours; <br />$75.16/hr <br />445.93 <br />$33,516.10 <br />Profit 10% of Direct Cost <br />10% <br />$123,231.90 <br />TOTAL <br />$194,580.20 <br />Legal - Engineering - Project Management <br />Engineering work and/or contractibid prep; 4.25% of Contract <br />4.25% <br />$60,643.22 <br />Reclamation Management and/or Administration; 4.00% of <br />Contract <br />4.00% <br />$57,075.97 <br />TOTAL <br />$117,719.19 <br />Total Site Reclamation Cost <br />$1,544,618.41 <br />Parcel 30, 31 and 32; Phase I Liability (SL -07) <br />$347,158.56 <br />revised required surety <br />$1,197,459.85 <br />-Remaining <br />Current Required Surety <br />$1,629,326.91 <br />SL -08 Releasable Amount <br />$431,867.06 <br />Any person with a valid legal interest which might be adversely affected by this proposed decision may <br />request a formal public hearing before the Mined Land Reclamation Board in accordance with Rule <br />3.03.2(6). Public notice of this proposed decision will be published twice in the Fort Lupton Press as soon <br />8 1 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.