My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-07_PERMIT FILE - C2010089A (11)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089
>
2016-01-07_PERMIT FILE - C2010089A (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2017 9:56:06 AM
Creation date
2/11/2016 10:27:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089A
IBM Index Class Name
PERMIT FILE
Doc Date
1/7/2016
Doc Name
Protection of Hydrologic Balance
Section_Exhibit Name
Section 2.05.6(3)
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Those areas that are affected by mining will be graded to post mining topographies that generally <br />feature slopes no greater than 5:1. In combination with the reclamation and topsoil handling <br />techniques, reduced slopes will minimize the potential for erosion due to accelerated sheet wash <br />or gullying. <br />Diversions will be designed according to accepted design criteria, and will be built to minimize <br />erosion and prevent additional contributions of sediment by limiting the flow velocities and <br />tractive forces that cause erosion. Temporary diversions in place longer than a growing season <br />will be seeded with a temporary seed mix as outlined in Section 2.05.4(2)(e). Diversions have <br />been designed to maximize geomorphic stability while minimizing disturbance. All temporary <br />diversions will be removed and reclaimed after mining activities have been completed. Plans <br />have been developed for water rights augmentation pumping that will meet effluent limitations <br />and minimize erosion. Drainage from haulage and access roads will be routed to the sediment <br />pond. Where necessary, culverts will be designed and constructed using approved engineering <br />design criteria to minimize erosion and prevent the contribution of additional sediment to runoff. <br />Surface Water Quantity The Operations Plan - New Horizon North (Map 2.05.3-1) details <br />pond diversion and culvert locations that will control all drainage into, through and out of New <br />Horizon North mining area. Surface water flow at NHN is primarily the product of seasonal <br />irrigation, (See Section 2.04.7). The 2nd Park Lateral will be diverted through a HDPE pipeline <br />around the mining area. Once mining has advanced far enough to the north, the HDPE pipeline <br />will be moved to the approximate original 2nd Park Lateral right-of-way. Downstream irrigation <br />water flow will not be interrupted. The plan has been developed for insuring that changes in <br />surface water quantities are minimized. The impact of designed structures proposed for the New <br />Horizon North mining area (sediment pond, diversion ditches, culverts, etc.), was determined to <br />have no significant effect on surface water quantity (see Probable Hydrologic Consequences at <br />the end of this section). <br />The sediment ponds have been designed according to acceptable engineering criteria to contain <br />(at a minimum) the 10 -year, 24-hour runoff volumes. WFC will ensure that the ponds maintain <br />this capacity by dewatering and/or excavating excessive sediment accumulated according to <br />plans outlined in Section 2.05.3(3), Mine Facilities. <br />Diversions have been designed to pass the 10 -year, 24-hour runoff volumes in accordance with <br />approved engineering design criteria. Culverts and road drainage -ways will insure that runoff <br />originating within or outside each mining area will be controlled and adequately routed through <br />to minimize changes in surface water quantities. <br />Section 2.05.6(3) Page 6 Sept. 2015 (TR -11) <br />
The URL can be used to link to this page
Your browser does not support the video tag.