My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-19_PERMIT FILE - M2015049 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2015049
>
2016-01-19_PERMIT FILE - M2015049 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:39 PM
Creation date
2/11/2016 8:02:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015049
IBM Index Class Name
Permit File
Doc Date
2/10/2016
Doc Name
Response
From
DNR Water Resources
To
DRMS
Email Name
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />COLORADO <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 821 <br />Denver, CO 80203 <br />RECEIVED <br />FEB 10 2016 <br />DIVISION 0'7 <br />MINItI'O.s <br />Response to Notice of 112 Construction Materials Reclamation Permit Application Consideration <br />DATE: February 9, 2016 <br />TO: Elliott R. Russell, Environmental Protection Specialist <br />CC: Division 1 Office, District 49 Water Commissioner <br />FROM: Justina P. Mickelson, Physical Science Researcher Scientist <br />RE: Operator: Yuma County, Meeks Pit; File No. M-2015-049 <br />Section 28, Twp 5 S, Rng 44 W, 6th P.M., Yuma County <br />CONDITIONS FOR APPROVAL <br />• The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />❑ The proposed operation will consume ground water by: ❑ evaporation, ❑ dust control, ❑ <br />reclamation, ❑ water removed in the mined product, ❑ processing, ❑ other: . <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />❑ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />❑ The proposed operation may have potential impact on existing water rights near the project <br />location. Applicant needs to demonstrate that the proposed project will not alter or impact the <br />historic operation of existing water rights. <br />• The applicant has indicated plans to use other water provided by a local well for dust control. <br />Applicant should be able to document that this water came from a source approved for industrial <br />use. Applicant should contact the water commissioner for further information. <br />❑ The applicant has not identified any proposed use of water at the permit site. If water will be used <br />for any purpose at this site, the applicant will need to document that the water was obtained from a <br />legal source, the water was diverted in priority under a water right decreed for such industrial use or <br />the use of water was approved by the Colorado Ground Water Commission for such industrial use. <br />COMMENTS: The applicant may contact the State Engineer's Office with any questions. <br />1313 Sherman Street, Room 821, Denver, CO 80203 P 303.866.3581 F 303.866.2223 www.water.state.co.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.