Laserfiche WebLink
Terror Creek, LLC <br />Page 3 <br />02/10/2016 <br />Quality Control Division (WQCD), the WQCD will be <br />responsible for enforcing CDPS permit conditions. <br />No discharges were reported during 2015. <br />6. Parameters to be <br />sampled for NPDES <br />CDPS permits COG- <br />Based on a Memorandum of Understanding between the <br />reporting <br />850028 <br />Division of Reclamation, Mining and Safety and the Water <br />Quality Control Division (WQCD), the WQCD will be <br />responsible for enforcing CDPS permit conditions. <br />No exceedances were noted during the 2015 water year as <br />no flow was reported in all four quarter of 2015. <br />7. CDPS discharge <br />limitations <br />CDPS permits COG- <br />Based on a Memorandum of Understanding between the <br />850028 <br />Division of Reclamation, Mining and Safety and the Water <br />Quality Control Division (WQCD), the WQCD will be <br />responsible for enforcing CDPS permit conditions. <br />8. Sampling frequency <br />NA <br />No surface water monitoring is required. <br />at surface water sites <br />9. Parameters to be <br />No surface water monitoring is required. <br />sampled at surface <br />NA <br />water sites <br />10. Sampling frequency <br />No groundwater water monitoring is required. <br />of ground water <br />NA <br />monitoring wells <br />11. Basic Standards <br />A groundwater point of compliance was not established for <br />(Interim Narrative <br />CWQCC regulation <br />the Terror Creek Loadout. <br />Standard) for Ground <br />41.5.C.6 <br />Water <br />12. Parameters to be <br />No groundwater water monitoring is required. <br />analyzed in ground <br />NA <br />water samples <br />13. Prevention <br />CDRMS regulation <br />Based on the information presented in the 2015 AHR the <br />material damagee to the <br />4.05.1(1) <br />disturbance to the hydrologic balance within and adjacent to <br />the permit area caused by activities at the Loadout is the <br />