Laserfiche WebLink
TWENTYMILE COAL, LLC - FOIDEL CREEK MINE (C-82-056) <br />MR15-294, 6MN COMPRESSOR BUILDING EXPANSION <br />TECHNICAL ADEQUECY RESPONSES (02/16) <br />I Twentylnile Coad, LLC. (TC) proposes to replace or add pages 2.05-105.1, 106, 106.1, 106.2, 106.3 and 106.4. <br />The proposed revised pages do not follow the currently revised text. The sections are I-eorgcrnized and would restrh <br />in duplicate paragraphs from text preceding the proposed revised pages in some cases. The section proposed to be <br />revised frith MR294 does not appear to have been revised except for possibly changing of the font size. Please <br />revieN' the currently approved sections and Inake proper rel'iSiOnS' 10 the text so that the pages are paginated <br />correctly and follow each other frith the preceding and subsequent pages. Please insure currently approved text <br />unrelated to the revision is not eliminated or duplicated The currently approved text can be vieiwd online on the <br />Dil'lsion 's website. <br />Response: The revised pages have been compared with the existing approved permit text, and have been modified <br />for consistency and continuity. Copies of the revised pages accompany these responses for replacement in the PAP. <br />2. Some of the dimensions shoivli on the proposed revised plan "6MN Air Compressor Building North and South <br />Pad Expansions Plan and Side Views " submitted to be included in Exhibit 49A are too shall to read. Please <br />submit a revised plan with legible dimensions. <br />Response: A pdf of the referenced drawing was sent to the CDRMS, allowing the drawing to be "blown -up" so <br />that the dimensions are readable. A larger scale print of the drawing also accompanies these responses for insertion <br />in the PAP. <br />3. The cost estimate provided u4th the revision indicates the equipment remol'al cost for this project are already <br />included in the current cost esiiniate for the 6M7V installation. The Division reviewed the cost estimate and this <br />does not appear to be case. Please provide the follolving information for the cost estimate and update page 2.05- <br />45.12 to include this ii forInation. <br />a. Please provide the dimensions of'the two new compressors <br />b. Please provide the dimensions Of the rivo dryers <br />c. Please provide the dimensions of the compressor after -coolers <br />Response: The reason the reclamation cost estimate does not include the compressors and dryers, is that these <br />equipment units are leased and would be removed by the leasing firm when no longer needed. For reference, the <br />two compressor units are approximately 14' x 6' x 6', and the two dryer units are approximately 6.5' x 6.5' x 7' <br />The after -coolers are owned and are approximately 7' x 6' x 2'. <br />