Laserfiche WebLink
OhMULITION WORK <br />Task description: Lemul;6un/removal of onsite facilities a..d at. acts., e3 <br />Site: MRI -Continent LST Pc1111i1 A%tit711: 1x-4 Recalc Permit/Job#: M1ySL1L1 <br />PROJECT IDENTIFICATION <br />Task #: OlA state: Colorado_ <br />Date: 10/26/2015 County: Garfield <br />User: ACY <br />Agency or orgt[1ur.at;v11.1an1e: ORMS <br />UNIT COS is <br />Abblev;atiun: None <br />1-ilena...e: M121 -01a <br />Location adiustment: 102.20 % <br />Structure or Item Demolition Menu <br />D;au'c.w;vu� <br />Description Selection <br />- — <br />Mill facility 30'h x 50'w Plant (3S) demo./on-site <br />Quantity <br />Unit <br />Unit <br />Cost <br />Total Cost <br />187,500.00 <br />CF <br />$0.25 <br />$46,500.00 <br />125'1 disposal in excavated pit <br />- Max. 200 ft. push <br />Conveyor 40' Conveyor, elevated, <br />40.00 <br />LF <br />$44.42 <br />$1,776.80 <br />including supports - 5 ft. <br />W x 6 ft. H housing <br />Silo (2) su'h,. iUct (L) Lading and 5 mile <br />174.50 <br />CY <br />$9.48 <br />$1,654.26 <br />haul, salvage allowed - <br />Steel frame structures <br />Scales (2) su'1,. 1L'w Loading and 5 mile <br />ls.sj <br />CY <br />$9.48 <br />$126.37 <br />haul, salvage allowed - <br />Steel frame structures <br />Scale rlouac 10 1 x 10' Bldg. (Sl) demo./on- <br />1,000.00 <br />CF <br />$0.17 <br />$174.00 <br />site disposal in existing <br />pit or cut - Max. 200 ft. <br />push <br />i utAl Cu3t <br />Subtotal (adjuatOl to, <br />Job Hours: 40.00 (u..aHjubteil): $50,231.43 lacadull): $51336.52 <br />_Ari\7- non--PCr4abCc <br />