Laserfiche WebLink
Reveg W.ksheet CUut'n <br />Task # 06A <br />Page /- of z <br />Description Cost /Acre <br />Hydro seeding (MEANS -12 92 iy.14 u/-uu) $847.24 <br />Tutal Seen AppliWivu CUA/Acre 1 $$47.24 <br />MULCHING and MISCELLANEOUS <br />Materials <br />_Description <br />Units / <br />Acre Unit <br />Cost / Unit <br />Cost /Acre <br />Herbicide - 2.4u C i.0 pt ac <br />1.00 ACRE <br />1.00 ACRE <br />$1.23 <br />$153.53 <br />$1.23 <br />$153.53 <br />Hyd,o...,,1eh tackife._ <l� ac. {Materials Ont <br />Total Mulch Materials Cost/Acre <br />$0.00 <br />$154.76 <br />T <br />r <br />NA -mulch appix.tim, "* xi. w.Iri riyn.t7aceaui <br />Weed spay_ tru�K_ non -aquatic died, nox. [DMG] <br />NURSERY STuLK PLANTINk, <br />CO3t /Aa e <br />$0.00 <br />$61.49 <br />Total Mulch Application Cost/Acre 1 $61.49 <br />Common Name <br />No / <br />Acre <br />Type a,.'a 5;tee <br />rlautilig <br />t=;U,t <br />Fertilizer <br />Pellet Cost <br />CO3t /AC, e <br />Oak Gambel's <br />50 <br />Bare .UUE Seedlu' lg; 11-1b ;..Cn nt. <br />$1.52 <br />$0.00 <br />$81.00 <br />LU.uu <br />(MEANS) <br />Serviceberry <br />50 <br />1529L I 00 acenlLig, 11-15 ;uCtt ht. <br />$1.62 <br />$0.00 <br />$81.00 <br />(MEA -Ns) <br />Totals Nursery Stock Cost / Acre <br />$162.00 <br />JuB TIME AND COST <br />CIRCES Cost Estimating Software <br />No. of Acres: 8 Lott /ACLe: $25141.27 <br />Estimated Failure Ratc: 25% Cost/Acre: $1,979.27 <br />*Selected Replant;..g <br />_ <br />Wmk IM...s: I ILLING-5LtwNG,MULCHING <br />Initial Job Cost: <br />$17,130.16 <br />Reseeding Job Cost: <br />$3,vns.a4 <br />Total Job Cu5t: <br />$Ll,Us9 <br />Job HOUL3: <br />LU.uu <br />CIRCES Cost Estimating Software <br />