Laserfiche WebLink
BULLDOZER R1rY1NU WUKK <br />Task dc3e.iptim,: xip upper and lower access roads <br />Site: Mid -Continent LST PCl/- .t AC[LOn: 1K-4 Keca1C rettu'vJOb#: M1982121 <br />PRUJEC:T IDENTIFICATION <br />Ta3k iF: u.)A State: Colorado <br />Date: 01812-0 15 County: Garfield <br />Unci: ACY <br />Agency or o.ga..ic.atiO....ame: ijt ms <br />HUUKLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8U <br />Ripper Attachment: 3 -Shank Rippe. <br />Cost B reakdo w..: <br />Abbreviation: None <br />Filena.L.r,: M121 -0.)a <br />tiOLaeYuweL: _ 310 <br />5111tt tiasib: I per day <br />Data Source: (CRG) <br />Area: <br />6,45.1 <br />Scin. C Velocity: NA teevbecond <br />Average Ripping Depth. <br />2.56 <br />Utilization % <br />OwLLCL3niy CO.WHOUL: <br />$69.05 <br />NA <br />OYe.ating Cowriour: <br />$108.22 <br />100 <br />Ki1,1,et upetating Cost/Hour: <br />$7.46 <br />100 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />1 Otal Unit LOavriOuL: <br />$222.73 <br />6,800 <br />Total Fleet Cost/Hour: <br />$445.46 <br />Jub Efficiency: <br />U.83 <br />Net LOLLectitlu: <br />5electe8 eztluiating Lnettlod: Area <br />Alternate Methods: <br />u.58 <br />Adjuated tiouLly rleet nuduction: <br />Sei3.nic: NA <br />Bank Volume: NA <br />BCY <br />Area: 2.00 acres <br />Rip Depth (ft): 2.00 <br />VolunX: <br />SOUIM Of e3tiLLLa[ea yuaLLCity: <br />HOURLY PRODuuTIUN <br />Seismic: <br />Area: <br />6,45.1 <br />Scin. C Velocity: NA teevbecond <br />Average Ripping Depth. <br />2.56 <br />Average RipFing Width: <br />/.us <br />Ave.ase RipFi .g Length: <br />300.00 <br />AvMage DOaet SyeCT — <br />88.00 <br />Ave. age miineuver lime: <br />0.25 <br />Production per unit area: <br />0.822 <br />Jub CO..diti 4i COL CCtiOL. kdUOLA <br />Unadjusted Hourly U..it P,oductimi: <br />6. 8.4.z <br />Site Altitude: <br />6,800 <br />Altitude Ads: <br />1.00 <br />Jub Efficiency: <br />U.83 <br />Net LOLLectitlu: <br />0.83 <br />Adju3ted Hu.,ly unit r.Oduction: <br />u.58 <br />Adjuated tiouLly rleet nuduction: <br />1.36 <br />JOB TIME AND COST <br />Fleet 3Le: Z vLa3eL(3) Total job time: <br />ULut CO3t: $3/-5.4.)4 Per acre Total job cost: <br />LLLYh <br />aeg.ees <br />teet <br />feet <br />feet <br />ai.. e3/ ho u. <br />ACL es/tlr <br />feet <br />(1;A1 tiff) <br />(1 bnift/day) <br />multiplier <br />AcL es/hr <br />Acres/hr <br />NA <br />1.47 Hours <br />t5cY O. cc <br />$653 <br />CIRCES COR Estimating Software <br />