My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-08_REPORT - M1976056
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1976056
>
2016-02-08_REPORT - M1976056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2020 9:01:36 PM
Creation date
2/9/2016 10:16:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976056
IBM Index Class Name
Report
Doc Date
2/8/2016
Doc Name
Annual Fee, Report & Map
From
McAtee Construction Company
To
DRMS
Annual Report Year
2016
Email Name
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
McAtee Construction Company Riverside Pit <br /> Permit# M-1976-056 2016 Annual Report <br /> On September 16, 2013 the South Platte River over topped its banks south of the mine and flooded <br /> much of the mine area. In Lake Robert the flood entered the south side of the mine and exited on <br /> the north leaving an overflow channel. Annually since then,flood waters have enter Lake Robert <br /> and the lake area continues to be filled. A Technical Revision was filed with the Division in July <br /> 2015 to allow us to monitor and do remedial reclamation of the filling area until it stabilizes. In <br /> addition, we will be installing an armored outlet on the north end to prevent further erosion of that <br /> bank. The West side of Lake Robert was disturbed by flooding and will need remedial work to <br /> complete the reclamation once that area stabilizes. <br /> NOTES: <br /> (7) As noted above all of the reclamation complete in Lake Robert appears to have survived the <br /> flood for the most part. The area around the east and north side have begun to return to near <br /> pre-flood conditions except where water scoured soil and vegetation from the land along the river. <br /> Approximately 4.72 acres of the old lake are has been backfilled to date. <br /> (9) We backfilled approximately 0.88 acres along the north side of the West Lake. No new area <br /> was reclaimed along the South Platte River in Lake Robert and remedial work continues in the Lake <br /> Marjorie area to clean up and repair the flood damage. <br /> (10) Mining continued on the south end of the West Lake, partially mining 0.72 acres +/- and we <br /> may move into the area stripped. Construction of the armored outlet on the north end of Lake <br /> Robert will be completed by spring runoff in 2016. <br /> (13) Weed control was done in June 2015 this year in accordance with the Weed Management Plan <br /> approved in 2012 on the perimeter of the mine and spot work was done on the Plant Site areas and <br /> roadways. The Russian Olive trees removed have not returned. Weed control will continue as <br /> described in the Weed Plan. <br /> (18) The current bond is $131,200. It was reevaluated this fall and is adequate to complete <br /> reclamation on the mine. <br />
The URL can be used to link to this page
Your browser does not support the video tag.