My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-08_REPORT - M1976056
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1976056
>
2016-02-08_REPORT - M1976056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2020 9:01:36 PM
Creation date
2/9/2016 10:16:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976056
IBM Index Class Name
Report
Doc Date
2/8/2016
Doc Name
Annual Fee, Report & Map
From
McAtee Construction Company
To
DRMS
Annual Report Year
2016
Email Name
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 4 <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: 5.60 seeded w/ $ 87 w/topsoil 8.87 mulched w/ na <br /> approved mix: _ replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: 18.60 fertilized w/ NA replacement 6" rate(tons/ac): na <br /> a vd fertilizer: depth(in.): <br /> Seed Fertilizer Mulch <br /> application Drilled application NA application NA <br /> method: method: method: <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? YES XX XX <br /> If"YES",indicate the weed species, control area,control type,application rate and treatment date on the report map. <br /> 14. Is adequate topsoil reserved for reclamation,based on your approved permit? YES XX Dom( <br /> If"NO",please explain: <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES M <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater,is the site in compliance with the approved mining plan and Office of the State <br /> Engineer(Well Permit, S.W.S.P.,and/or Permanent Augmentation Plan)? YES XX 1X <br /> 17. Are all hazardous materials stored within approved spill containment structures? YES J-M XX <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? YES XX XX <br /> 19. Is your basis for legal right to enter still valid? YES XW <br /> 20. Does your permit require you to submit monitoring information annually? NO <br /> If"Yes",please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials(C.R.S. 34-32-116 or 34-32.5-116),attach a map to this report that accurately depicts the permit <br /> boundary,current affected area boundary and location of the acreages specified in items 7- 12 and 14. <br /> UPDATED MAP ATTACHED: YES <br />
The URL can be used to link to this page
Your browser does not support the video tag.