Laserfiche WebLink
-4 - <br />Schlosser Incorporated <br />Permit M-2014-061 <br />Stipulation No. 1: <br />The Operator shall request, in writing t the Division, that the financial warranty be increased prior to commencing <br />mining operations in additional phase(s). This request shall include an updated reclamation cost for the additional <br />acreage. Prior to approval, the Operator will need to post the additional associated Financial Warranty, which shall <br />be calculated by the Division and issued through a Surety Increase, for the additional phases(s). <br />Commitment No.1: <br />The Operator has committed to obtaining a soil test after final grading and topsoil replacement has been achieved. <br />The Operator shall submit the test results and proposed application mulch and fertilizer to the Division for approval. <br />