My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-05_REVISION - M1977227
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977227
>
2016-02-05_REVISION - M1977227
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:06 PM
Creation date
2/9/2016 8:00:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977227
IBM Index Class Name
Revision
Doc Date
2/5/2016
Doc Name
Incomplete Application SO02
From
Super Ex., LLC
To
DRMS
Email Name
LJW
GRM
BJC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br /> 12. Total acres in various stages of reclamation,since permitted mining activities began: <br /> Total acres ti-; Total acres Total acres es-j: Total acres <br /> backfilled: [60 seeded w/ c, w/topsoil mulched w/ /fq <br /> (Acxes approved mix: replaced: 5 approved mulch: f <br /> Total acresec <br /> -, Total acres Topsoil , Mulch application <br /> graded: fertilized w/ /9 replacement rate(tons/ac): f <br /> t 3 apvd fertilizer: / depth(in.): a` / <br /> Seed Fertilizer Mulch <br /> itoid 41/ <br /> application ' application application AI/r <br /> method: Ad itX Xi )( method: I`-1/1 method: <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? YE NO N/A <br /> If"YES",indicate the weed species,control area,control type,application rate and treattnen ��..a--t��e��..on the report map. <br /> 14. Is adequate topsoil reserved for reclamation,based on your approved permit? �'Y NO N/A <br /> If"NO",please explain: <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO A <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of th to <br /> Engineer(Well Permit, S.W.S.P.,and/or Permanent Augmentation Plan)? YES NO N/ <br /> 17. Are all hazardous materials stored within approved spill containment structures? YES NO N/ <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? QV NO N/A <br /> 19. Is your basis for legal right to enter still valid? (- NO <br /> 20. Does your permit require you to submit monitoring information annually? YES C N/A <br /> If"Yes",please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> • Construction Materials(C.R.S.34-32-116 or 34-32.5-116),attach a map to this report that accurately depicts the permit <br /> boundary,current affected area boundary and location of theacreagesspecified in�items <br /> +7- 12 and 14. UPDATED <br /> MAP ATTACHED: :20/s- r�Q t C 4„„f, Tkt ier-t <br /> -fledr � 0003f,( - . <br />
The URL can be used to link to this page
Your browser does not support the video tag.