Laserfiche WebLink
PREPARED BY, STOVER & ASSOCIATES, INC. <br /> St, Unit B <br /> SEWO F r11 Grand rat., co 81601 <br /> REFERENCES <br /> •�'_� \1�O A- ` REVISIONS <br /> No. DESCRIPTION: BY DATE <br /> 2 <br /> 6 2008 Reclamation Update TKH 01109 <br /> ,-9 7 2009 Reclamation Update <br /> Ky 01 70 <br /> V\ 8 2010 Reclamation Update TKH 01/11 <br /> 9 2011 Rec/omotion Update TKH 02112 <br /> �h 1 10 2012 Reclamation Update <br /> i <br /> 11 2013 Reclamation Update TKH 02114 <br /> IJI 2015 Reclamation Update 7KH 01116 <br /> • J <br /> \ ) � KEY <br /> lIj _Represents areas r backftl/ed, graded <br /> report <br /> and seeded during report year <br /> h \ 7 � Represents areas pemanently seeded <br /> prior to report year <br /> #20 -CBA No.2 a e <br /> � p.B gcrec reGa mad[xd PM1III BBM RD <br /> (1nga,ea Pem,aaem Ph 111 Bond R) oo U� Represents areas that have achieved final <br /> �Phase lllrelease <br /> (zB.z A°ea Rnm eaM Rtl) <br /> I <br /> Represents areas where Tamarisk was <br /> treated during report year <br /> #22-ROADSIDE NORTH PORTAL MINE <br /> „ #33 - UNIT TRAIN LOADOUT Represents areas re-seeded during report year <br /> #9-CRDA-2 FACILITIESoAND STOCKPILE AREA �� 66.z PeaPmBBOMRao) <br /> fze.egcneR a Phil <br /> B,x0_leom Regl s A .'+ <br /> \ (09quea Permenenl PhBI ROM RA) <br /> A- � PERMIT UNDARY �' ' <br /> \ / tlieN (,03Acres Ph1115- Rd) <br /> #11-6RDA 18-CRDA-1 ��`����`� "^\ / (z z gcrea Pnln Boca Raq - "•"' <br /> / ha.egcrea Ps.a AGea Phin eoM RI7 �� ., ;." _ <br /> JJ <br /> a <br /> • I <br /> F V <br /> #32-CRDA#1 ROAD <br /> _ 6 &ENERGY PONDS <br /> " AM oiepoNd Ands <br /> z a.Acres ReGz �/ <br /> ( <br /> �q�' #34CRDA 1 2 <br /> X & <br /> i' <br /> ' r -� . (aBA«eaPc,menemP 10) ♦ � e� m <br /> CEL <br /> ( metl) /�n�� � � yam- • �✓�.�-+.�,.....��.� / <br /> ( h1116OM Rel) / A (• 1 = <br /> � #25-CAMEO <br /> TOPSOIL PIILES 8� / ��\ 'kb(2A Aces <br /> • 2 - PERMANENT FLOOD CONTROL DIKE <br /> #14 - NORTH DECLINE <br /> • � aa Aces Pnln Bond Rd) �-`_ j INE DEWATERING SYSTEM <br /> Sa _.. \ , ♦ a ;'- ., �'� I (0.5 Aces PM1lll6 na Rd) <br /> #10-CBA No.1 �-- I • <br /> Reclaimed Areas through 2015 aeAcreclxsPhbIBOMReI[) <br /> #1 - Blue Flame Mine; Fall fired Area report). <br /> ept available on maps (Work performed voluntarily <br /> and therefore not required for this re art . <br /> #2 - Permanent Flood Control Dike, Fall 1985 - Ph III Bond Release on 2.8 acres In April 2011 I & ,,� . 26 CONVEYOR CORRIDOR <br /> PG%P PLAN <br /> #3 & #4 - South Lease Exploration; Fall 1985 and Spring 1986-See Exhibit SL-07-021 - Ph III Bond Release on r J <br /> 7.0 acres in November 2015 '�. <br /> DECLINE � <br /> i ` • 4 a .�4� (18,6Anse Reddmdl[127Ph1lIBwr Rell) <br /> #5 & #6 - North Decline; Fall 1992, Spring 1993, November 2000, April 2002, October 2011 (1]Aces Pe,ma,nM[05 Phil]BwA RN)) <br /> (Cheatgross treatment - November 2005 & September 2006) (Tamarisk treatment/removal t <br /> in NO Channel - October 2014) - Ph III Bond Release on 12.7 acres and 0.5 permanent disturbance acres in November 2015 \ 31 - RAILROAD LOOP TRACK <br /> A %j (9.3A cos Phnl Bond Rd W <br /> #7 - NW Intake Portal; Spring 1993 - Ph III Bond Release on 0.1 acres in November 2015 ♦ • / /j NORTHWEST <br /> INTA' #7 NORT KE PORTAL <br /> #8 - Cameo Refuse Disposal Area No. 1; July 1994 - Ph III Bond Release on 10.3 acres in November 2015 (o.,Aces PhnleMR1) r <br /> i <br /> #9 - Cameo Refuse Disposal Area No. 2; July and December 1994 and November 2001 - Ph III Bond Release on 7.5 acres in November 2015 00 <br /> • ®� <br /> #10- Cameo Borrow Area No. 1; July and December 1994, April 2002 and October 2012 - Ph III Bond Release on 2.5 acres in (November 2015 \ o <br /> J h l <br /> #11- Cameo Refuse Disposal Area No. 1 (Misc); July 1994 - Ph III Bond Release on 2.2 acres in November 2015 3 <br /> #12- South Fan; October 2000 - See Exhibit SL-16-009 Ph III Bond Release on 0.9 acres in November 2015 <br /> #13- 2 West Portals; October 2000 and October 2005 - See Exhibit 58 - Ph III Bond Release on 0.3 acres in November 2015 g `' , f SHADSCALE <br /> + ! I • REFERENCE REA <br /> #14- North Decline Mine Dewatering System; April 2002 - Ph III Bond Release on 0.5 acres in November 2015 ')I F %' <br /> #15- Roadside Refuse Borrow Area; November 2002 - Ph III Bond Release on 3.4 acres in November 2015 le •+ RECEIVED <br /> #16- Roadside Refuse Disposal Area; November 2002 - Ph III Bond Release on 1.3 acres in December 2010 and 7.1 acres in November 2015 \ O <br /> v1 a 1 o FEB 0 52016 <br /> #17- Roadside South Portal Upper Diversion Ditch; November 2002 - Ph III Bond Release on 1.1 acres in November 2015 J <br /> O / ONis OF RECLAMATION <br /> #18- Cameo Refuse Disposal Area No. 1; April 2002; Redisturb approximately one (1) acre on top of CRDA #1; December 2009 °1 U 7 ^&SAFETY <br /> Re-seed redisturbed one (1) acre on top of CRDA #1; September 2010 - Ph III Bond Release on 13.8 acres in November 2015 �, • %j <br /> z • <br /> #19- Cameo Refuse Disposal Area No. 2; April and November 2002 - Ph III Bond Release on 20.2 acres in November 2015 ♦ ' I o <br /> #20- Cameo Borrow Area No. 2, Pond 11 and Coal Gulch Realignment; April 2002 and October 2012; Pond 11 area reseeded October 2105 <br /> Ph III Bond Release on 2.1 acres and 1.4 permanent disturbance acres in November 2015 <br /> #21- Access Road and Powerlines to No. 2 West Portals; No seeding required - Ph III Bond Release on 3.8 permanent disturbance acres ♦ #27 -CONVEYOR CORRIDOR ( <br /> in November 2015 /' (+.6 Aces[1.3 PM1III BOM Rtl1) 1 <br /> ! #29 - ROADSIDE SOUTH PORTAL MINE FACILIIES, <br /> #22- Roadside North Portal Facilities, Stockpile Areas, G Substation, Pond 13 & Upper Diversion Ditch; November 2002, August 2003, December <br /> ♦ I/ STOCKPILE/PREP PLANT AREA, PONDS, ETC. <br /> l . (14 4 Acres[13.5 PM1III Bond!RHI) <br /> 2005, September 2008 & October 2012 - Ph 111 Bond Release on 21.1 acres & 1.7 permanent disturbance acres in November 2015 <br /> #23- Substation B; November 2002 4 <br /> #24- 2 West Portals (Exhibit 58); December 2001 - Ph III Bond Release on 0.7 acres in November 2015 <br /> i; • <br /> #25- Cameo Refuse Disposal Area Topsoil Piles; April 2002 - Ph III Bond Release on 2.9 acres in November 2015 <br /> #26- Conveyor Corridor; July 2003 - Ph III Bond Release on 0.5 acres in November 2009 and 2.2 acres in April 2011 <br /> #16- ROADSIDE REFUSE � <br /> #27- Conveyor Corridor; March 2004; (Tamarisk removal of apprx. 1.3 acres in January 2006) - Ph III Bond Release i DISPOSALAREA • B \ _ <br /> on 1.3 acres in November 2009. <br /> _do, /" RA Aces PhJd♦ #28 -SUBSTATION A N <br /> #28- Substation A; August 2007 AA�) <br /> � PERMIT BOUNDARY <br /> #29- Roadside South Portal Mine Facilites and Stockpile/Prep Plant Area and Conveyo Tunnel Under 1-70; o <br /> W E <br /> Backfilled and Regrading completed December 2007. Seeding completed February & March 2008 - Ph III Bond Release J DO <br /> j \ <br /> on 13.5 acres in December 2010. Pond 8 backfilled and seeded in Oct 2011. Pond 9 backfilled and seeded in Z <br /> April 2013. (Pond 8 re-seeded in Oct 2014) Z) ap�"p{� S <br /> O %-- r"' ,1 I ONE INCH <br /> #30- Roadside South Portal Road to Old Upper Diversion Ditch and Water Tank (Light Use Road #1); September 2007 H a ;x-' % • DESIGNED: <br /> #17- ROADSIDE SOUTH PORTA DRAWN: D.A.,A 1D/D6/a2 <br /> #31- Railroad Loop Track (south of I Wo Road); January 2009 - Ph III Bond Release on 0.3 acres in November 2009 w UPPER DIVERSION DITCH 15 - ROADSIDE REFUSE • CHECKED: <br /> e® PREPARED FOR: <br /> tL (1.1 Aces PhulBndR) BORROW AREA <br /> #32- CRDA #1 Road; Placed, compacted, covered and seeded 1.2 acres September 2010 Q Gee[J.<PhIIIBMRGI) <br /> ° #23-SUBSTATION B As <br /> #33- UTL, Rail Spur, Overland Conveyor & Haul Road; Backfill and regrading was completed on apprx. 38.1 acres at this area <br /> • C ad a SNOWCAP COAL COMPANY <br /> by October 2010. 0.9 acres was seeded - Ph III Bond Release on 66.7 acres and 0.9 permanent disturbance acres in April 2011 • P O.Box 1430,Palisade,CO 81526 <br /> #34- Cameo Refuse Disposal Area No. 1 & 2 Sediment Ponds (Ponds 6 & 10) & Coal Creek Realignment; October 2012 - Ph III Bond Release #30 - ROADSIDE SOUTH PORTAL ROAD TO OLD UPPER <br /> on 0.8 permanent disturbance acres in November 2015 DIVERSION DITCH AND WATER TANK(LT USE RD#1) PROJECT: <br /> o (1.BAces) L --._ SNOWCAP COAL COMPANY <br /> #35- Haul Roads to CRDA 1, 2 & 3 remain as permanent features - Ph III Bond Release on 3.4 permanent disturbance acres in November 2015 j o nne <br /> ANNUAL RECLAMATION <br /> CAD_D6velSpare101d-D-DrivelPmderhomCoal\Powderhom\PemitWorkAmualReciamab.Repo OIMRR �� - ♦ 2015 <br /> • DRMS I.D. No. C-1981-041 DWG. NAME: <br /> SCALE: 2015ARR <br /> 1" = 400' <br />