My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-29_PERMIT FILE - M2016002
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016002
>
2016-01-29_PERMIT FILE - M2016002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:15:32 PM
Creation date
2/8/2016 3:42:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016002
IBM Index Class Name
Permit File
Doc Date
1/29/2016
Doc Name
Application
From
Donald J. Self
Email Name
TC1
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H. Reclamation. Describe the annual and final reclamation standards based on the anticipated schedule for construction, <br />operations. and project closure Include such items as the removal of structures and facillies inducing bridges and culverts, a <br />revegetation plan,permanent containment of mane tailings,waste,or sludges which pose a threat of a release into the environment, <br />closing ponds and 91irpinating standing water,a final surface shaping plan,and post operations monitoring and maintenance plans. <br />We will perforn4Ceurrent partial reclamation of the trench(s)as we mine and perform a final reclamation of all trenches <br />at the close of each mining project <br />All disturbed areas will be back-filled,re-contoured and re-seeded with US Forest approved seed mixtures and planted <br />with poderosa trees if applicable at the end of each project period. <br />At the termination of the operations all disturbances will receive a final re-graing,re-seeding,re-planting and monitored <br />for one calendar year or until 70%re-growth is observed. <br />VI. FOREST SERVICE EVALUATION OF PLAN OF OPERATIONS <br />A. Required changes/modifications/special mitigation for plan of operations: <br />B. Bond. Reclamation of all disturbances connected with this plan of operations is covered by Reclamation <br />Performance Bond No.dated (mm/dd/yy) , signed by Principal) and Surety), for the <br />penal sum of . This Reclamation Performance Bond is a guarantee of faithful performance with the terms and <br />conditions listed below, and with the reclamation requirements agreed upon in the plan of operations. This <br />Reclamation Performance Bond also extends to and includes any unauthorized activities conducted in connection <br />with this operation. <br />The bond amount for this Reclamation Performance Bond was based on a bond calculation worksheet. The bond amount may be <br />adjusted during the term of this proposed plan of operations in response to changes in the operations or to changes in the economy. <br />Both the Reclamation Performance Bond and the bond calculation worksheet are attached to and made part of this plan of <br />operations. Acceptable bond securities(subjed to change)include: <br />1. Negotiable Treasury bits and notes which we unconditionally guaranteed as to both principle and interest in an amount <br />equal at their par value to the penal sum of the bond;or <br />2. Certified or cashier's check,bank draft,Pest Office money order,cash,assigned certificate of deposit,assigned savings <br />account,blanket bond,or an irrevocable letter of credit equal to the penal sum of the bond. <br />Ifmore space Is marled to JIM out a bloat of lajossnatiats,use addiYbwd sheets and much fora/
The URL can be used to link to this page
Your browser does not support the video tag.