My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-05_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2016-02-05_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:06 PM
Creation date
2/8/2016 9:05:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
2/5/2016
Doc Name
Adequacy Response
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Type & Sequence
MR149
Email Name
ZTT
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRI-STATE GENERATION AND TRANSMISSION ASSOCIATION, INC. <br />HEADQUARTERS: P.O. BOX 33695 DENVER, COLORADO 80233-0695 303-452-6111 <br />February 3, 2016 <br />Mr. Zach Trujillo <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining & Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: Colowyo Coal Company L.P. <br />Permit No. C-1981-019 <br />Minor Revision No. 149 <br />Cumulative Bond Schedule — Collom Haul Road <br />Dear Mr. Trujillo: <br />RECEIVED <br />FEB 0 5 2016 <br />DIVISION OF RECLAMATION <br />MINING & SAFETY <br />Tri-State Generation and Transmission Association, Inc. (Tri-State), is the parent company to <br />Axial Basin Coal Company, which is the general partner to Colowyo Coal Company L.P. (Colowyo). <br />Therefore, Tri-State on behalf of Colowyo is submitting this adequacy response to minor revision 149 <br />(MR -149) to Permit No. C-1981-019. <br />Tri-State received your adequacy response letter dated January 21, 2016, which included a <br />cumulative bond cost estimate of $3,629,656.19. Tri-State requested the Division calculate this bond cost <br />estimated so Colowyo can begin construction of the Collom Haul Road. Tri-State and Colowyo have <br />reviewed the reclamation cost estimate (RCE) as provided by the Division, and with this letter is <br />providing a formal agreement with the RCE amount. <br />If you should have any additional questions or concerns please feel free to contact Tony <br />Tennyson at (970) 824-1232 at your convenience. <br />DJC:TT:dbr <br />Enclosure <br />bcc: Kurt Blunt (via email) <br />Chris Gilbreath (via email) <br />Tony Tennyson (via email) <br />File: G471 -11.3(21)d <br />Colowyo CF 1.1.1.136 <br />AN EQUAL OPPORTUNITYIAFFIRMATIVEACTION EMPLOYER <br />A Touchstone Energy'Cooperative <br />Sincerely, <br />;1' <br />ez�� <br />Daniel J. C iraro <br />Senior Manager <br />Environmental Services <br />CRAIG STATION ESCALANTE STATION NULLA STATION <br />P.O. BOX 1307 P.O. BOX 577 P.O. BOX 698 <br />CRAIG. CO 81626-1307 PREWrM NM 87045 NUCLA, CO 81424-0698 <br />970-824-4411 505-972-5200 970-864-7316 <br />
The URL can be used to link to this page
Your browser does not support the video tag.