Laserfiche WebLink
Snowcap Coal Company, Inc. <br />-5- 2015 Annual Reclamation Report <br />"Seed Mix, Table 14-14" inter -seeded <br />Phase III Bond Release — 12.2 acres <br />Pond 7, SAE Sediment traps (sumps) and 18" V -ditch were reclaimed in <br />2011. Phase 1& II Bond Release on 0.9 acres and Phase III Bond <br />Release on 0.4 acres were approved with SL -8 on November 14, 2015. <br />Located in the NY2NEY4, Section 34 and the NW%NWY4, Section 35, <br />T10S, R98W, 6th P.M. <br />Area — 0.9 acres <br />Date - October, 2011 <br />Seed Mix - "Seed Mix, Table 14-8" Upland Components <br />Phase III Bond Release — 0.4 acres <br />Permanent Disturbance - North Decline - The West diversion ditch <br />#1, East diversion ditches #1 & #2, the 12" CMP and the 12" V - <br />ditches, 1.3 acres, are approved as permanent features. Also, <br />access road #2 at the North Decline, 0.4 acres, is approved as a <br />permanent feature. Phase I & II Bond Release on 1.7 acres and <br />Phase III Bond Release on 0.5 acres were approved with SL -8 on <br />November 14, 2015. Located in the NY2NE%4, Section 34 and the <br />NW'/4NWY4, Section 35, T1 OS, R98W, 6th P.M. <br />Area — 1.7 Acres <br />Phase III Bond Release — 0.5 acres <br />6. North Decline - treatment building, A -substation and power line between <br />A and A -substations. Phase I Bond Release was approved on 0.1 acres <br />with SL -2 on October 27, 2003. Phase II & III Bond Release was <br />approved on 0.1 acres with SL -8 on November 14, 2015. Located in <br />EY2NE% and NE%SEY4, Section 34, T1 OS, R98W, 6th P.M. <br />Area - 0.1 acres <br />Date - Spring 1993 <br />Seed Mix -"Seed Mix, Table 14-9" <br />Phase III Bond Release — 0.1 acres <br />7. NW Intake Portal - Backfill portal located in NWY4NE'/, Section 34, T1 OS, <br />R98W, 6th P.M. Phase I Bond Release was approved on 0.1 acres with <br />SL -2 on October 27, 2003. Phase II & III Bond Release was approved on <br />0.1 acres with SL -8 on November 14, 2015. <br />Area - 0.1 acres <br />Date - Summer 1993 <br />Seed Mix - No seed mix information on file. <br />Phase III Bond Release — 0.1 acres <br />8. Cameo Refuse Disposal Area No. 1 - Covered benches 1, 2, & 3. Phase <br />Bond Release was approved on 10.3 acres with SL -2 on October 27, <br />2003. Phase II & III Bond Release was approved on 10.3 acres with SL -8 <br />on November 14, 2015. Located in the SEY4 Section 28, TI OS, R98W, 6th <br />P.M. <br />Area - 10.3 acres <br />