Laserfiche WebLink
Snowcap Coal Company, Inc. <br />-8- 2015 Annual Reclamation Report <br />16. Roadside Refuse Disposal Area (including new Upper Diversion <br />Ditch) - Re-contoured the refuse pile and placed 20" of cover material and <br />6" of topsoil on all slopes and benches. Seeded with approved seed mix <br />during November. Phase I Bond Release was approved on 7.1 acres with <br />SL -2 on October 27, 2003, and 1.3 acres with SL -4 on January 11, 2009. <br />The 1.3 acres achieved final Phase II & III Bond Release with SL -6, <br />approved on Dec. 14, 2010. Phase II & III Bond Release was approved <br />on 7.1 acres with SL -8 on November 14, 2015. Located in the SEY4 <br />Section 34, T10S, R98W, 6th P.M. <br />Area - 8.4 acres <br />Date - November 2002 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />Phase III Bond Release — 8.4 acres <br />17. Roadside South Portal Upper Diversion Ditch - This ditch was removed <br />and restored to approximate original contours during the excavation of the <br />Roadside Refuse Borrow Area. It was permanently seeded with an <br />approved seed mix during November of 2002. Phase I Bond Release was <br />approved on 1.1 acres with SL -2 on October 27, 2003. Phase II & III Bond <br />Release was approved on 1.1 acres with SL -8 on November 14, 2015. <br />Located in the SEY4 Section 34, T10S, R98W, 6th P.M. <br />Area - 1.1 acres <br />Date - November 2002 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />Phase III Bond Release — 1.1 acres <br />18. Cameo Refuse Disposal Area No. 1 - Re-contoured upper bench, <br />regraded the top of the pile, covered all slopes, benches and the top of the <br />pile with 24 inches of material. Established collection ditches and rip - <br />rapped the ditches in accordance with the reclamation plan. This pile was <br />seeded during April 2002. Phase I Bond Release was approved on 14.8 <br />acres with SL -2 on October 27, 2003. Approximately one (1) acre was re - <br />disturbed in December 2009 on top of CRDA #1 as a lay down area for <br />coal refuse delivered from McClane Canyon Mine and remaining SCC <br />coal fines clean up. The one acre of re -disturbance was reclaimed and <br />reseeded in September 2010. Phase II &111 Bond Release was approved <br />on 13.8 acres with SL -8 on November 14, 2015. Located in the SEY4, <br />Section 28, T10S, R98W, 6th P.M. <br />Area - 14.8 acres; 1 acre (reseed) <br />Date - April 2002; September 2010 (reseed) <br />Seed Mix - "Seed Mix, Table 14-13", Upland Components <br />"Seed Mix, Table 14-8", Upland Components (reseed) <br />Phase III Bond Release — 13.8 acres <br />19. Cameo Refuse Disposal Area No. 2 - The final reclamation of this refuse <br />pile included covering and top soiling the upper benches and the top of the <br />pile. Also a new diversion ditch was constructed just above the pile. The <br />Old Upper diversion ditch was reclaimed and restored to approximate <br />original contours and then reseeded. Phase I Bond Release was <br />