Laserfiche WebLink
MT7 <br />Page 6 of 149 <br />CIRCES Cost Estimating Software <br />Max. 200 ft. <br />push <br />Brazell -Simms <br />60'x40'xl5' <br />Bldg. (MN) <br />36,000.00 <br />CF <br />$0.21 <br />$7,704.00 <br />Building <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 200 ft. <br />push <br />-Footers <br />1'x2'x192 <br />Demo. and on- <br />192.00 <br />LF <br />$6.99 <br />$1,342.08 <br />LF <br />site disposal in <br />excavated pit, <br />1.0 ft. x2 ft. - <br />Max. 200 ft. <br />push <br />-Pad <br />60'x40'x4" <br />Demo. and on- <br />2,400.00 <br />SF <br />$1.17 <br />$2,808.00 <br />site disposal in <br />excavated pit, <br />4 in. thick - <br />Max. 200 ft. <br />push <br />No. 9 Portal <br />24'x50'x12' <br />Bldg. (MN) <br />43,200.00 <br />CF <br />$0.21 <br />$9,244.80 <br />Warehouse/Bathhouse <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 200 ft. <br />push <br />-Footers <br />1'x2'x420 <br />Demo. and on- <br />420.00 <br />LF <br />$6.99 <br />$2,935.80 <br />LF <br />site disposal in <br />excavated pit, <br />1.0 ft. x 2 ft. - <br />Max. 200 ft. <br />push <br />Reclamatin <br />70'x100'x15' <br />Bldg. (MN) <br />105,000.00 <br />CF <br />$0.21 <br />$22,470.00 <br />Building(Pole Barn) <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 200 ft. <br />push <br />-Footers <br />1'x2'x334 <br />Demo. and on- <br />334.00 <br />LF <br />$6.99 <br />$2,334.66 <br />LF <br />site disposal in <br />excavated pit, <br />1.0 ft. x 2 ft. - <br />Max. 200 ft. <br />push <br />-Pad <br />1'x2'x4" <br />Demo. and on- <br />7,000.00 <br />SF <br />$1.17 <br />$8,190.00 <br />site disposal in <br />excavated pit, <br />4 in. thick - <br />Max. 200 ft. <br />push <br />500 Gallon Antifreeze <br />500 Gallons <br />Comprehensive <br />1.00 <br />EA <br />$3,646.20 <br />$3,646.20 <br />Tank; #5 Fuel Island <br />storage tank <br />removal, non - <br />leaking - 3,000 <br />to 5,000 gal. <br />tank <br />8000 Gallon Diesel <br />8000 <br />Comprehensive <br />1.00 <br />EA <br />$7,292.40 <br />$7,292.40 <br />Fuel Tank; #5 Fuel <br />Gallons <br />storage tank <br />Island <br />removal, non - <br />leaking - 6,000 <br />CIRCES Cost Estimating Software <br />