Laserfiche WebLink
Task description: Cost S1 <br />Site: Williams Fork Mines <br />PROJECT IDENTIFICATION <br />Task #: 000 <br />Date: 2/4/2016 <br />User: JLE <br />COST SUMMARY WORK <br />Permit Action: MT7 <br />State: Colorado <br />County: Moffat <br />Agency or organization name <br />TASK LIST (DIRECT COSTS) <br />DRMS <br />Permit/Job#: C1981044 <br />Abbreviation: None <br />Filename: C044-000 <br />Task <br />Form <br />Description Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />007 <br />008 <br />009 <br />011 <br />012 <br />014 <br />015 <br />016 <br />018 <br />019 <br />020 <br />021 <br />022 <br />023 <br />024 <br />025 <br />026 <br />027 <br />028 <br />029 <br />031 <br />032 <br />033 <br />034 <br />035 <br />037 <br />038 <br />040 <br />041 <br />042 <br />043 <br />044 <br />045 <br />Structure Demolition DEMOLISH <br />1 <br />1 <br />1 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 <br />1 <br />4 <br />4 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2,977.82 <br />$863,426.08 <br />$92,617.93 <br />$46,554.00 <br />$86,816.00 <br />$396,442.00 <br />$9,236.00 <br />$1,651.00 <br />$10,833.00 <br />$2,684.00 <br />$55.00 <br />$830.00 <br />$589,290.00 <br />$25,350.00 <br />$33,701.00 <br />$1,618.00 <br />$2,205.00 <br />$2,794.00 <br />$2,170.00 <br />$1,854.00 <br />$2,373.00 <br />$2,418.00 <br />$1,388.00 <br />$806.00 <br />$1,912.00 <br />$6,065.00 <br />$2,302.00 <br />$84.00 <br />$682.00 <br />$86.00 <br />$253.00 <br />$29.00 <br />$139.00 <br />$965.00 <br />$95.00 <br />$123.00 <br />$200.00 <br />Plug and Seal All Wells BOREHOLE <br />248.00 <br />Seal and Backfill All Mine and Vent Shaft Entries MINESEAL <br />200.00 <br />Regrade Portal No. 5 Facilities Area DOZER <br />60.93 <br />Regrade Portal No. 5A Facilities Area DOZER <br />278.23 <br />Push Gravel and Rock to Box Cut at Portal No. 5A DOZER <br />6.52 <br />Overland Conveyor Corridor DOZER <br />1.17 <br />-Regrade <br />Regrade Old Shop Area at Empire Village DOZER <br />7.64 <br />Regrade Mine No. 9 Refuse Pile DOZER <br />1.89 <br />Remove Fill from No. 5 Mine Dewatering DOZER <br />Borehole Access Road <br />0.04 <br />Regrade Access Road DOZER <br />0.59 <br />Cover Mine No. 9 Portal Refuse and Facilities DOZER <br />Area with Berm <br />415.82 <br />Replace Topsoil from Stockpile to Refuse Pile SCRAPERI <br />32.70 <br />Haul Subsoil from Berm to Refuse Pile SCRAPERI <br />43.48 <br />Push Waste Rock at Portal No. 5A to Highwall DOZER <br />1.14 <br />Rip Rock Crusher Area RIPPER <br />1.50 <br />Rip Portal No. 5A Lower Bench RIPPER <br />1.90 <br />Remove Access Road and Haul Material to Refuse SCRAPERI <br />Pile <br />2.80 <br />Finish Grade Portal No. 5 Area GRADER <br />13.26 <br />Finish Grade Portal No. 5A Area GRADER <br />16.97 <br />Finish Grade Refuse Area GRADER <br />17.29 <br />Finish Grade Portal No. 9 Refuse and Facilities GRADER <br />Area <br />9.93 <br />Finish Grade Old Shop Area GRADER <br />5.76 <br />Regrade Ponds 5-P5, 5-P6, 5-P7 and Ramps SCRAPERI <br />2.47 <br />Regrade Sewage Treatment Ponds 5-P1, 5-P2 and DOZER <br />5-P3 <br />4.28 <br />Regrade Pond 5A -P1 DOZER <br />8.77 <br />Regrade Pond SHP2 DOZER <br />0.32 <br />Regrade Pond SHP1 DOZER <br />2.60 <br />Regrade Pond 9-P3 DOZER <br />0.33 <br />Regrade Pond 9-P1 DOZER <br />0.96 <br />Regrade Pond 9-P4 DOZER <br />0.11 <br />Regrade Pond 9-P5 DOZER <br />0.53 <br />Regrade Pond 9-P6 DOZER <br />3.68 <br />Regrade Pond 9-P7 DOZER <br />0.36 <br />Regrade Pond 9-P8 DOZER <br />0.47 <br />Regrade Pond 9A -P3 DOZER <br />0.76 <br />