My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-04_REVISION - C1981044
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2016-02-04_REVISION - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:05 PM
Creation date
2/5/2016 9:13:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Revision
Doc Date
2/4/2016
Doc Name
Reclamation Cost Estimate
From
Jared Ebert
To
Tabetha Lynch
Type & Sequence
MT7
Email Name
TNL
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MT7 <br />Page 10 of 149 <br />CIRCES Cost Estimating Software <br />Wx 6ft.H <br />housing <br />Silo; 10,000 Storage <br />70'D x 25'h <br />Explosive <br />384,845.00 <br />CF <br />$0.29 <br />$111,605.05 <br />Silo <br />demolition, <br />large projects - <br />Concrete <br />structures <br />-Push Concrete into <br />14000 CY <br />Cat DIOT - <br />16.00 <br />EA <br />$342.66 <br />$5,482.56 <br />fill <br />l OSU <br />-Silo Footers <br />2'x 3' x <br />Demo. and on- <br />220.00 <br />LF <br />$20.96 <br />$4,611.20 <br />220LF <br />site disposal in <br />excavated pit, <br />2.0 ft. x 3 ft. - <br />Max. 200 ft. <br />push <br />Laboratory/Sample <br />Trailer <br />Bldg. (SN) <br />1,792.00 <br />CF <br />$0.19 <br />$338.69 <br />Building <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 200 ft. <br />push <br />Remove Rail Spur <br />11600 LF <br />Railroad track - <br />11,600.00 <br />LF <br />$9.01 <br />$104,516.00 <br />Ties and track <br />-Remove Ballast <br />3900 CY <br />Railroad track - <br />3,900.00 <br />CY <br />$4.45 <br />$17,355.00 <br />Ballast <br />Electrical Substations <br />4 <br />NON -PCB <br />4.00 <br />EA <br />$2,500.00 <br />$10,000.00 <br />(4) <br />Transformer <br />Removal <br />-Pad <br />20'x 20'x <br />Demo. and on- <br />400.00 <br />SF <br />$1.71 <br />$684.00 <br />6" <br />site disposal in <br />existing pit, 6 <br />in. thick - Max. <br />200 ft. push <br />-Fencing <br />750 LF <br />Fencing, chain <br />750.00 <br />LF <br />$2.98 <br />$2,235.00 <br />link, including <br />posts and <br />fabric - 8 ft. to <br />10 ft. high <br />Fuel Island at No. 5 <br />30'x 40'x <br />Demo. and on- <br />1,200.00 <br />SF <br />$1.75 <br />$2,100.00 <br />Portals <br />6" <br />site disposal in <br />excavated pit, <br />6 in. thick - <br />Max. 200 ft. <br />push <br />Fuel Island at No. <br />30'x 40'x <br />Demo. and on- <br />1,200.00 <br />SF <br />$1.75 <br />$2,100.00 <br />5a/6 Portals <br />6" <br />site disposal in <br />excavated pit, <br />6 in. thick - <br />Max. 200 ft. <br />push <br />Overland Conveyor - <br />1250 LF <br />Conveyor, <br />1,250.00 <br />LF <br />$17.56 <br />$21,950.00 <br />P5 to Stockpile <br />overland, <br />including <br />supports - 5 ft. <br />Wx 6ft.H <br />housing <br />Elevated Conveyor - <br />570 LF <br />Conveyor, <br />570.00 <br />LF <br />$44.42 <br />$25,319.40 <br />P5 to Stockpile <br />elevated, <br />including <br />supports - 5 ft. <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.