Laserfiche WebLink
Upper Poudre Combined SWSP Page 7 of 11 <br /> January 28, 2016 <br /> Table D - Final Reclamation Summary <br /> Site Name DRMS Permit Bond Comments Associated Decrees <br /> Final Reclamation Amount <br /> Ground water lakes requires plan for 92CW157 Conditional storage <br /> Home Office Ground water takes $3,153,345 augmentation to be filed three years right for North Shores <br /> Pitprior to the completion of mining. Reservoir. Requires lining. <br /> Currently bonded for lining. <br /> 2000CW251 - Conditional <br /> Overland storage right for various <br /> Ponds Site Lined reservoirs $1,948,000 Currently bonded for lining. reservoirs (collectively known <br /> as the Overland Trail <br /> Reservoirs). Lined. <br /> North Taft Ground water lakes requires plan for 92CW157 Conditional storage <br /> Hill Expansion Ground water lakes $470,124 augmentation to be filed three years right for Taft Hill Reservoir. <br /> Site prior to the completion of mining. Requires lining. <br /> Currently bonded for backfilling. <br /> Conditions of Approval <br /> I hereby approve this substitute water supply plan, in accordance with Section 37-90-137(11), <br /> C.R.S., subject to the following conditions: <br /> 1. This plan is approved with the effective date of January 1, 2016 and shall be valid through <br /> December 31, 2016 unless otherwise revoked or modified. If this plan will not be made <br /> absolute by a water court action by the plan's expiration date, a renewal request must be <br /> submitted to this office with the statutory fee (currently $257 for each mining site) no <br /> later than November 15, 2016. <br /> 2. Well permits have been obtained for the current use and exposed surface areas the three <br /> subject pits in accordance with 5 37-90-137(2) and (11), C.R.S. in conjunction with this plan. <br /> Failure to maintain valid well permits may cancel approval of this plan. <br /> 3. The total surface area of the ground water exposed after December 31, 1980 for each of the <br /> pits shall not exceed those values listed in Table A of this approval. Should the total surface <br /> area exposed exceed those amounts, an amendment will need to be filed with this office. <br /> 4. The total amount of ground water to be appropriated from each of the pits shall not exceed <br /> the values listed in Table B of this approval. <br /> 5. Approval of this plan is for the purposes as stated herein. Any additional uses of this water <br /> must first be approved by this office. Any future additional historical consumptive use credit <br /> given (e.g., agricultural water transfer) for these sites must consider all previous credits <br /> given. <br /> 6. All releases of replacement water must be sufficient to cover all out-of-priority depletions in <br /> time, place, and amount and must be made under the direction and/or the approval of the <br /> water commissioner. The Applicant is required to notify the water commissioner any time <br /> deliveries are made to the 8.5-acre pond via the Taylor 8 Gill Wasteway while the pond is <br /> not spilling into the Cache La Poudre River. <br /> 7. The release of replacement water may be aggregated to maximize beneficial use. The water <br /> commissioner and/or the division engineer shall determine the rate and timing of an <br /> aggregated release. <br /> 8. The replacement water that is the subject of this SWSP cannot be sold or leased to any other <br /> entity. As a condition of subsequent renewals of this SWSP, the replacement water must be <br />